Land Use Application Permit # 2024-0922, App. # 2024-002006, UID # 212558
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

Enter Applicant Contact Information:
Name:
Christel Bret
Phone:
(763234 - 8652
Email Address:
ccbret@icloud.com
Mailing Address:
9544 194th Ct SE
Becker Mn 55308
Are you the Property Owner? Yes

Property Location

Property Location:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
26-0-04490019069 STATE HWY 27
MCGREGOR, MN 55760
RICE RIVER TWPS:28 T:46 R:23BIBLE, SCOTT & BRADLEY ANDBIBLE, SCOTT & BRADLEY AND

Project Checklist

1.) Is the property zoned Shoreland? No
2.) Is the property located in a flood zone? No
3.) Are there any wetlands or lowlands on/near the project site? No
4.) Will the structure(s) be used for commercial purposes? No
5.) Is there an existing septic system on the property?
(Outhouse/Privies are also considered septic systems)
No
6.) Are you applying to install a new septic system? No

Project Description

Please describe your proposed project:
Moving a 10x12 shed on property.

Project Type

Item 1 - Structure Type: Accessory Building
Item 1 - Type of Construction: Wood/Frame
Item 1 - Size: 120 ft2

Site Plan

Attach Site Plan:
Is the site staked and ready for inspection? Yes

Terms

Land Use/Septic Terms & Conditions
  • All appropriate permit fees must be paid in full prior to review of the application.
    Permit fees are non-refundable after a permit is approved.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
    Property lines need to be clearly marked or staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
    Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."

  • Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

  • I acknowledge that by submitting this application, the application and its attachments are public information.

Invoice #61735 (10/11/2024)

Charge Cost Quantity Total
Non-Taxable
added 10/11/2024 12:57 PM

$50 Flat Fee

$50.00 x 1 $50.00
Grand Total
Total $50.00
Payment 10/11/2024$50.00
Due$0.00

Approvals

ApprovalSignature
ApplicantChristel C. Bret - 10/11/2024 12:58 PM
590bd719c1819c856b7f9aab32e63c08
75057ae6882b99ec5f0e011c48a58bf0
#1 Administrative ReviewConnor Plagge - 10/14/2024 10:30 AM
1cb38e89c5089811a6164fdb0767a2b2
110186e479ac11d94b1dd20136002b75
#2 Inspector ReviewConnor Plagge - 10/14/2024 10:31 AM
9d0431596e0c8ca28040c3aef3397225
b4e93a66d83aa7a2e15154e758300a40
#3 Final ApprovalConnor Plagge - 10/14/2024 12:10 PM
e5b8c8968bd730bcad4089753011e095
e315d495fe86c41693c59e6225013bcc
Application has been approved. All signatures have been obtained.

Public Notes

Text:
Permit #49125

Approved for a 120 sq ft Accessory Building

*Structure must be placed at least 50 feet from the Right-of-Way
File(s):

Admin Checklist

Date application was complete: 10/11/2024
Review started by: Connor Plagge
Zoning District of project location: Farm Residential
Required OWHL setback distance:
"Other" OHWL setback distance is:
Project located in the floodplain? No
Base Flood Elevation:
Lowest Floor Elevation:
Is an after construction elevation certificate required?
Property line setbacks appear to be met? Yes
Road R-O-W setbacks appear to be met? Yes
Bluff setbacks appear to be met? N/A
Septic Tank setback appears to be met with/without an engineer's report? N/A
Septic Drainfield setback appears to be met with/without an engineer's report? N/A
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? Yes
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? New Construction
Is this After-The-Fact? No

Inspector Checklist

Zoning Inspector: Connor Plagge
Attach necessary inspection forms/photos:
    Notes:
    Was an onsite conducted for this application? No
    Powered by