Land Alteration Permit # 2024-0847, App. # 2024-001876, UID # 212377
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

If we have questions on the application who should we contact?
Name:
greg rono
Phone:
(218839 - 3371
Email Address:
randrsales@live.com
Mailing Address:
42880 260th lane
Aitkin MN 56431
Are you the Property Owner? No

Property Owner Contact

Property Owner Phone Number:
(612819 - 7191
Property Owner Email Address: ckbuechele@gmail.com

Project Location Search

Property:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
35-1-08990049559 358th Pl
PALISADE, MN 56469
WAUKENABO TWPSUNSET KNOLLS:14 T:49 R:26RDWAUKENABO LAKEBUECHELE, MARK & CONSTANCE TRUSTEESBUECHELE, MARK & CONSTANCE TRUSTEES
Driving directions to the property from Aitkin.:
169 to 358th

Project Description

Please describe your proposed project:
rip rap 50ft of shoeline add rock to exsting
Will you be removing vegetation during this project? No

Site Drawing(s)

Land Alteration Site Sketch Checklist:
Location of erosion control measures.
Attach a copy of your Site Sketch(s):

Excavation Details

Nature of Material to be used?
(Check all that apply)
Rock
Total Amount of Excavation and/or Fill proposed? (cubic yards) 30 CuYd
Total Area to be Graded and/or Filled? (L x W) 240 ft2
Attach a photo of the area to be altered (as it exists today).:

Erosion Control Practices

Indicate the following erosion control measures that
will be used throughout and after your project?
(Check all that apply)
Silt Fence
Describe how you intend to implement this plan
and your finished vegetation plan.:
natural erioson control

Terms

General Terms Zoning Permits
  • All appropriate permit fees must be paid in full prior to any necessary review(s) of application.

  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

  • To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.

  • I acknowledge that by submitting this application, the application and its attachments are public information.

Land Use/Septic General Terms
  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

Invoice #61564 (09/23/2024)

Charge Cost Quantity Total
Non-Taxable
added 09/23/2024 7:08 AM

$200 Flat Fee

$200.00 x 1 $200.00
Grand Total
Total $200.00
Payment 09/23/2024$200.00
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantGreg Rono - 09/23/2024 7:08 AM
794f4fc0ac31b01da7e8278e786a6bb6
de9f47f67acbd3545ae0948568423441
 
#1 Administrative ReviewHenry Egland - 09/23/2024 9:31 AM
c91f3ab463c60fa506825c57cb6555a9
1daa3d28d5033c5d321850e9d973605a
 
#2 Inspector ReviewHenry Egland - 09/26/2024 2:18 PM
9ace23a8f10042af472fe2966bdc6971
48063d3a1ad142934d6644b974dfebb1
 
#3 Final ApprovalConnor Plagge - 09/26/2024 3:32 PM
60774d4b063187b03d7e4c34b9f7378b
7beecbe5afdb97cc807e171b4f9f6ee2
 
Application has been approved. All signatures have been obtained.
Text:
Permit #49067

Approved: Land Alteration - Rip-Rap
- Rip-Rap extent shall not extend greater than what is shown on the attached photo.
Condition: Must implement erosion control during and post construction.
File(s):
Text:
File(s):
    Date application was complete: 09/23/2024
    This review has been started by: Henry Egland
    Zoning District of project location: Shoreland
    Zoning Inspector: Henry Egland
    Attach necessary inspection forms:
    Is the project in the Shore Impact Zone? Yes
    Was an onsite conducted for this application? Yes
    Is this an After-The-Fact application? No
    Project located in the floodplain? Yes
    Base Flood Elevation:
    Powered by