OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
If we have questions on the application who should we contact? |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Project Location Search
Property: |
|
Driving directions to the property from Aitkin.: | hwy 47 to co rd 12, south on 12 appx 8 miles to 295th st, head east on 295th, appx 1 mile in on the north side of the road just over the river. |
Project Description
Please describe your proposed project: | Improving an existing driveway, with a turnaround of appx 40x60' on top of the hill, north of the existing farm house. plan is to follow current tracks up to the farm house, site is not flagged as it's currently pasture. appx 200yds of fill needed. erosion control to be determined by dirt worker but is noted on plan. Note: vegetation being removed is grass from old driveway. |
Will you be removing vegetation during this project? | Yes |
Site Drawing(s)
Land Alteration Site Sketch Checklist: | Location and size of all existing structures. Location and size of all proposed structures. Location of all driveways and/or access roads. Location of wetlands. Location and size of alteration. Location of erosion control measures. |
Attach a copy of your Site Sketch(s): |
|
Vegetation Removal
Number of Trees to be removed: | 0 |
Number of Shrubs to be removed: | 0 |
Type of Clearing Used?
(Check all that apply) |
Mechanical Clearing |
Please explain: | there will be no trees or shrubs removed, grass only. |
Excavation Details
Nature of Material to be used?
(Check all that apply) |
Gravel |
Total Amount of Excavation and/or Fill proposed? (cubic yards) | 175 CuYd |
Total Area to be Graded and/or Filled? (L x W) | 7200 ft2 |
Attach a photo of the area to be altered (as it exists today).: |
|
Erosion Control Practices
Indicate the following erosion control measures that will be used throughout and after your project? (Check all that apply) |
Silt Fence Sediment Control Logs |
Describe how you intend to implement this plan and your finished vegetation plan.: |
cut in silt fence, stake down sediment control logs. |
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.
I acknowledge that by submitting this application, the application and its attachments are public information.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #61420 (09/25/2024)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 09/25/2024 9:15 PM $200 Flat Fee |
$200.00 | x 1 | $200.00 |
Grand Total | |||
Total | $200.00 | ||
Payment 09/25/2024 | $200.00 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Linsey L. Searle - 09/25/2024 9:17 PM 004080030bbff5e35c687ba1fd2d9f26 fcf3e13f3d50a984c6fc770e1a02e93e | |
#1 Administrative Review | Henry Egland - 09/26/2024 10:32 AM d97265d4ef321cbc56cd36e1ae9e5ef3 a588ed7c471c6b5c655ef978e05cb29a | |
#2 Inspector Review | Henry Egland - 09/30/2024 1:57 PM a83685881d42bec3a810cb29763494eb 50267947416648df3c78cf80671a7ca0 | |
#3 Final Approval | Connor Plagge - 10/01/2024 9:01 AM e0639999c441f980602b3ca475919ddd 718dc83334ec90d45a7e75ab4d9d0ffe |
Text: | Permit #49081 Approved: Land Alteration - Fill greater than 50 cu/yrds |
File(s): |
|
Text: | Mark Ritter is doing the work. sw |
File(s): |
Date application was complete: | 09/26/2024 |
This review has been started by: | Henry Egland |
Zoning District of project location: | Shoreland |
Zoning Inspector: | Henry Egland |
Attach necessary inspection forms: |
|
Is the project in the Shore Impact Zone? | No |
Was an onsite conducted for this application? | Yes |
Is this an After-The-Fact application? | No |
Project located in the floodplain? | Yes |
Base Flood Elevation: |