If we have questions on the application who should we contact? |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | No |
Property Owner Contact
Property Owner Phone Number: |
|
||||
Property Owner Email Address: | cadoten11@gmail.com |
Project Location Search
Property: |
|
Driving directions to the property from Aitkin.: | leave aitkin northbound on us hwy169 approx 8 miles, then east on hwy 210 towards mcgregor for 6.5 miles. turn north on nature ave for 2.2 miles and then a left onto 430th st for 0.1 miles, turn right onto 301st ave for 0.1 miles, property is on the left |
Project Description
Please describe your proposed project: | the shoreline was pushed into an ice ridge this spring, the property had previously had a permit for a rip rapped shoreline, we would like to excavate and haul out the newly formed ice ridge and put the rip rap back so it more resembles its previous condition. |
Will you be removing vegetation during this project? | No |
Site Drawing(s)
Land Alteration Site Sketch Checklist: | Location and size of all existing structures. Location and size of all proposed structures. Location of all driveways and/or access roads. Location of wetlands. Location and size of alteration. Location of erosion control measures. Location of fill disposal, if done on site. Distance of alteration to OHWL (closest point) Distance of alteration to property lines. Distance of alteration to existing structures. Distance of alteration to proposed structures. Cross-section of cut and/or fill locations. |
Attach a copy of your Site Sketch(s): |
|
Excavation Details
Nature of Material to be used?
(Check all that apply) |
Black Dirt Rock Other (explain below) |
If other, please explain: | fabric |
Total Amount of Excavation and/or Fill proposed? (cubic yards) | 20 CuYd |
Total Area to be Graded and/or Filled? (L x W) | 0 ft2 |
Attach a photo of the area to be altered (as it exists today).: |
|
Erosion Control Practices
Indicate the following erosion control measures that will be used throughout and after your project? (Check all that apply) |
Seeding and/or Mulching |
Describe how you intend to implement this plan and your finished vegetation plan.: |
the new fabric and rip rap would come up slighty above grade to stop and run off into the lake. any affected areas behind it would be seeded to match existing lawn |
Other Information
Other: | this image is what it looked like when the original work was completed. |
Other Attachments (optional): |
|
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.
I acknowledge that by submitting this application, the application and its attachments are public information.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #61174 (07/30/2024)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 07/30/2024 12:42 PM $200 Flat Fee |
$200.00 | x 1 | $200.00 |
Grand Total | |||
Total | $200.00 | ||
Payment 07/30/2024 | $200.00 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Reid W. Riggs - 07/30/2024 12:44 PM 157487c9d15577fbc7d2ce85b2c9d12b ef1b7d66b8f178346b29028a7a39f2c5 | |
#1 Administrative Review | Henry Egland - 08/06/2024 10:41 AM 576a9c402bd663713ee5087dd66405f1 08725e645e0cbaed4faf9d31c4153743 | |
#2 Inspector Review | Henry Egland - 08/06/2024 10:42 AM 632f6929bdfa396977a6576c09df9a71 824f4b96b85352e9d7df535cdc8e656c | |
#3 Final Approval | Connor Plagge - 08/06/2024 3:47 PM 8c4ef0738913dd10023775a0d096d069 513400296080e167c869c76212f4ed5d |
Text: | Permit #48921 Approved: Annual Ice Ridge Repair & Rip-Rap Maintenance |
File(s): |
|
Text: | |
File(s): |
Date application was complete: | 07/30/2024 |
This review has been started by: | Henry Egland |
Zoning District of project location: | Shoreland |
Zoning Inspector: | Henry Egland |
Attach necessary inspection forms: | |
Is the project in the Shore Impact Zone? | Yes |
Was an onsite conducted for this application? | No |
Is this an After-The-Fact application? | No |
Project located in the floodplain? | Yes |
Base Flood Elevation: |