Septic Only Permit # 2024-0591, App. # 2024-001598, UID # 211871
App. Status: Approved
Valid: 07/22/2024
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

Applicant contact information:
Name:
Shayne Loverink
Phone:
(218256 - 9341
Email Address:
shayneloverink4x4@gmail.com
Mailing Address:
66955 420th Ave
Swatara MN 55785
Are you the Property Owner? Yes

Property Location

Property Location:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
55-0-01770452-27 UNORGS:22 T:52 R:27LOVERINK, SHAYNELOVERINK, SHAYNE
Enter directions to the property (if no address assigned):
gis

Septic Type

Select the system you are applying for:
Residential Mound (Type 1)

Design Information

Attach Septic Design & Management Plan:
Designer Name:
NameLicense #ExpirationPhoneAddressDesigner
Al Nystrom Construction LLCL167602/03/2024218-820-0558PO Box 354, Remer MN 56672Yes

Installer

Self Install or Licensed Install?: Licensed Septic Installer
Licensed Installer Name:
NameLicense #ExpirationPhoneAddressInspectorInstallerMaintainerService Provider
Hegman/Kern ExcavatingL21104/21/2025218-845-2014 45399 Highway 169, Palisade MN 56469NoYesNoNo

Terms

Septic Permit General Terms & Conditions
  • All appropriate permit fees must be paid in full prior to review of the application. Permit fees are non-refundable after a permit is approved.

  • The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction. It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • Property lines, septic sites, wells, and road right-of-ways must be clearly defined with flags, ribbon, or lathe prior to onsite inspection by Aitkin County.

  • SSTS Permits are valid for one (1) year (unless the permit is to upgrade an Imminent Threat to Public Health & Safety, which is then valid for ten (10) months).

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

  • Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.

  • Applicant acknowledges that by submitting this application, the application and its attachments are public information.

Invoice #61095 (07/19/2024)

Charge Cost Quantity Total
Non-Taxable
added 07/19/2024 10:05 AM

$350.00 x 1 $350.00
Grand Total
Total $350.00
Payment 07/19/2024$350.00
Due$0.00

Approvals

ApprovalSignature
ApplicantShayne Loverink - 07/19/2024 3:51 PM - witnessed by Brock Anderson
da652d325a2e6e6b54e7cf7ba2a8278d
b2d14083b6c883dc2ff57cbb8a7120ec
#1 Administrative ReviewBrock Anderson - 07/19/2024 4:16 PM
03eeebf92fb2756dae6679b7c60c7df9
e87be771821e3baebdd29fbfc9661405
#2 Final ApprovalConnor Plagge - 07/22/2024 8:32 AM
6475e3b73026a51b7bb7f8c0983bdd31
05cb7e635354c639f35f80182708e7ef
Application has been approved. All signatures have been obtained.

Public Notes

Text:
Permit #48870

Approved for 2 Bdrm Type 1 Mound Septic
File(s):

Admin Checklist

Date application was complete: 07/19/2024
This review has been started by: Brock Anderson
Zoning District of project location: Farm Residential
Required OHWL setback distance:
"Other" OHWL setback distance is:
Pumping Agreement Attached?
Low Interest Loan or SSTS Grant project?
Is this an After-The-Fact application? No
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? Yes

DESIGN REVIEW CHECKLIST

Design Reviewed By: Brock Anderson
SSTS Type: Type I
SSTS Design: Mound (Type I)
New or Replacement SSTS: New SSTS
GPD: 1-2,499 gpd
# of bedrooms: 2
Is this a Cluster System? No
Does this system belong to an Other Establishment? No
Does this system require an Operating Permit? No
Operating Permit #:
Additional info (optional):
    Powered by