Vegetation Alteration Permit # 2024-0578, App. # 2024-001562, UID # 211813
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

Are you the Property Owner? Yes
If we have questions on the application who should we contact?
Name:
Sean Ricketson
Phone:
(410507 - 3923
Email Address:
sean.ricketson@gmail.com
Mailing Address:
2545 Cheval Drive
Davidsonville MD 21035

Project Location

Property Location:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
29-1-49950016109 GOSHAWK ST
MCGREGOR MN 55760
SHAMROCK TWPOBERNOLTES ADDITIONS:25 T:49 R:23RDROUND LAKE (SHAM/HAUG TWPS)RICKETSON, SEANRICKETSON, SEAN
Driving directions to the property from Aitkin:
210 east left onto 65 north right onto 6 east (goshawk st) go past Lily Ave, driveway on right.  If 210 is closed, follow detour signs to get onto 65 North out of McGregor.

Project Description

Please describe your proposed project.:
(1) I am proposing to clear a 33 foot x 25 foot area along the shoreline of small diameter trees and shrubs (less than 5? diameter).  A grass cover and all trees over 5 inches in diameter will remain in these areas. The purpose of this open area is seating by the lake and to reduce habitat for wood ticks which are numerous in the area.  
(2) I also propose to remove some small hardwood trees within 100 feet of the lake and near the property line to the west, which were planted by the previous owner too close to the fir trees in the same location, preventing the fir trees from growing to their full height and width.

Vegetation Removal

Number of Trees to be removed: 20
Number of Shrubs to be removed: 10

Type of Clearing

Please select all that apply:
Mechanical Clearing
Hand Clearing
Please explain:
Small trees will be cut with a hand saw.  Low vegetation will be reduced in height with a gas powered string trimmer.

Required Attachments

Attach a copy of your plan drawing(s):
Attach photo(s) of the area to be altered as it exists today:

Terms

General Terms Zoning Permits
  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

  • To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.

  • I acknowledge that by submitting this application, the application and its attachments are public information.

Land Use/Septic General Terms
  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

Approvals

ApprovalSignature
ApplicantSean Ricketson - 07/11/2024 11:54 AM
a21d8a2dc54498c23fdc799e807e12d1
2a24c14b3798021a8e101f6cc5581528
#1 Administrative ReviewHenry Egland - 07/11/2024 12:36 PM
787e59cf42c2a70473e432fdbaf4f8f1
cfb3f06969dc4217ff0751995c2fbabb
#2 Inspector ReviewHenry Egland - 07/16/2024 10:27 AM
16d43f1e56b535023c263d1cec5f0efc
764654a95dcc3b051540fc8d5d1a18d3
#3 Final ApprovalConnor Plagge - 07/16/2024 3:24 PM
d410ea35b9943390a2b17f75a773a47c
0e4dacae4bafa208c32b43a125c62ded
Application has been approved. All signatures have been obtained.

Public Notes

Text:
Permit #48859

Approved for Vegetation Alteration.
File(s):

Internal Notes

Text:
File(s):
    Powered by