Land Alteration App. # 2024-001558, UID # 211812
App. Status: Denied
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

If we have questions on the application who should we contact?
Name:
Joe W Emery
Phone:
(218839 - 3965
Email Address:
emeryhydroseeding@charter.net
Mailing Address:
904 Porcupine Trl
Aitkin MN 56431
Are you the Property Owner? No

Property Owner Contact

Property Owner Phone Number:
(612328 - 3112
Property Owner Email Address: greg@grmechanical.com

Project Location Search

Property:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
35-0-02820049969 OSPREY AVE
PALISADE MN 56469
WAUKENABO TWPS:17 T:49 R:26RDESQUAGAMAH LAKEREINKING, GREG & CHERYL TRUSTEESREINKING, GREG & CHERYL TRUSTEES
Driving directions to the property from Aitkin.:
CR 1 north to osprey ave to address

Project Description

Please describe your proposed project:
Install 52 lineal ft of rip rap along shoreline
Will you be removing vegetation during this project? No

Site Drawing(s)

Land Alteration Site Sketch Checklist:
Location and size of all existing structures.
Location and size of all proposed structures.
Location of all driveways and/or access roads.
Location of wetlands.
Location and size of alteration.
Location of erosion control measures.
Location of fill disposal, if done on site.
Distance of alteration to OHWL (closest point)
Distance of alteration to property lines.
Distance of alteration to existing structures.
Distance of alteration to proposed structures.
Cross-section of cut and/or fill locations.
Attach a copy of your Site Sketch(s):

Excavation Details

Nature of Material to be used?
(Check all that apply)
Boulders
Total Amount of Excavation and/or Fill proposed? (cubic yards) 10 CuYd
Total Area to be Graded and/or Filled? (L x W) 312 ft2
Attach a photo of the area to be altered (as it exists today).:

Erosion Control Practices

Indicate the following erosion control measures that
will be used throughout and after your project?
(Check all that apply)
Floating Boom
Describe how you intend to implement this plan
and your finished vegetation plan.:
floating boom in lake during project

Terms

General Terms Zoning Permits
  • All appropriate permit fees must be paid in full prior to any necessary review(s) of application.

  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

  • To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.

  • I acknowledge that by submitting this application, the application and its attachments are public information.

Land Use/Septic General Terms
  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

Invoice #61040 (07/11/2024)

Charge Cost Quantity Total
Non-Taxable
added 07/11/2024 9:54 AM

$200 Flat Fee

$200.00 x 1 $200.00
Grand Total
Total $200.00
Payment 07/11/2024$200.00
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantJoe W. Emery - 07/11/2024 9:55 AM
0dd6bf13d453d8f57b838a3d8a5d1564
491e7f0972bf9ccd5a0a3175e1dc7249
 
#1 Administrative ReviewHenry Egland - 07/11/2024 12:28 PM
f43bf52e490dc920ecf92a40f2231593
e9e3a793db1a48f868c5158e7066b0d0
 
#2 Inspector Review 
App. Status must be Pending Review
#3 Final Approval 
App. Status must be Pending Review
Text:
Denied - Land Alteration: Rip-Rap

Findings: No current/active erosion problem observed during 7/15/2024 site inspection.

Notes: Erosion control to be implemented above OHWL per attached notes until vegetation is established on site. It should be noted that the "landing" area by the dock cannot be left as rock and will need to be put into vegetation.

Refund issued (200-site visit) $100. KB
File(s):
Text:
File(s):
    Date application was complete: 07/11/2024
    This review has been started by: Henry Egland
    Zoning District of project location: Shoreland
    Zoning Inspector: Henry Egland
    Attach necessary inspection forms:
    Is the project in the Shore Impact Zone? Yes
    Was an onsite conducted for this application? Yes
    Is this an After-The-Fact application? No
    Project located in the floodplain? No
    Base Flood Elevation:
    Powered by