OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Enter Applicant Contact Information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | No |
Property Owner Contact
Property Owner Email: | cnadelmann@gmail.com | ||||
Property Owner Phone: |
|
Property Location
Property Location: |
|
Project Checklist
1.) Is the property zoned Shoreland? | Yes |
2.) Is the property located in a flood zone? | No |
3.) Are there any wetlands or lowlands on/near the project site? | No |
4.) Will the structure(s) be used for commercial purposes? | No |
5.) Is there an existing septic system on the property? (Outhouse/Privies are also considered septic systems) |
Yes |
6.) Are you applying to install a new septic system? | No |
Existing Septic Status
Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? | Yes |
Project Description
Please describe your proposed project: | Paver patio with sidewalk and retaining wall |
Project Type
Item 1 - Structure Type: | Deck/Patio |
Item 1 - Type of Construction: | Masonry |
Item 1 - Size: | 240 ft2 |
Shoreland Data
Setback distance from Ordinary High Water Level to the proposed construction? (closest point) | 40 Feet |
Will the proposed structure(s) be less than 35 foot maximum height? | Yes |
Are you constructing a walkout basement? | No |
Natural Landscape Protection Plan
Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? | No |
How many cubic yards of fill or excavation will be done on the property? | 0 CuYd |
How close to the property line will any fill be placed or any excavation be done? | 30 Feet |
What percent slope of the land currently exists on the project site? | 5 % slope |
Select the erosion control methods that will be used throughout and after your project: (Check all that apply) |
Other (explain below) |
Other: | Project is done Just have to make smaller and then sod when done |
Site Plan
Attach Site Plan: |
|
Is the site staked and ready for inspection? | No |
Terms
All appropriate permit fees must be paid in full prior to review of the application.
Permit fees are non-refundable after a permit is approved.It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
Property lines need to be clearly marked or staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
I acknowledge that by submitting this application, the application and its attachments are public information.
Invoice #61019 (07/09/2024)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 07/09/2024 11:15 AM $150 Flat Fee |
$150.00 | x 1 | $150.00 |
Grand Total | |||
Total | $150.00 | ||
Payment 07/22/2024 | $150.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | jerry huelsnitz - 07/09/2024 11:15 AM 327290fb012c7a47abe0c9fc73c7cc06 2ae199a9d530e8320d2cb8adf648bcbb |
#1 Administrative Review | Henry Egland - 07/16/2024 10:06 AM 86f60f0b8907e7a935a876350a99001b c29899664c25abb6f122c366b1b15dfa |
#2 Inspector Review | Henry Egland - 07/22/2024 3:26 PM dfab7e323e298c00abeee9aae4f1f5dd ccf498479d3519c753dcb6ed687964c9 |
#3 Final Approval | Connor Plagge - 07/23/2024 8:48 AM 8376d0b50f57506fbe72ee89e18f5812 d5140df5863958f55f3c61658abe8ecd |
Public Notes
Text: | Permit #48853 Approved for Land Use: After-the-fact 240 sq/ft patio. Condition: Patio must be brought into compliance per the approved plan by October 31, 2024 |
File(s): |
|
Admin Checklist
Date application was complete: | 07/16/2024 |
Review started by: | Henry Egland |
Zoning District of project location: | Shoreland |
Required OWHL setback distance: | |
"Other" OHWL setback distance is: | |
Project located in the floodplain? | Yes |
Base Flood Elevation: | |
Lowest Floor Elevation: | |
Is an after construction elevation certificate required? | |
Property line setbacks appear to be met? | Yes |
Road R-O-W setbacks appear to be met? | Yes |
Bluff setbacks appear to be met? | N/A |
Septic Tank setback appears to be met with/without an engineer's report? | Yes |
Septic Drainfield setback appears to be met with/without an engineer's report? | Yes |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? | Redevelopment |
Is this After-The-Fact? | Yes |
Inspector Checklist
Zoning Inspector: | Henry Egland |
Attach necessary inspection forms/photos: |
|
Notes: | All setbacks were met. This is an after-the-fact patio that needs to be brought down in size to be compliant. |
Was an onsite conducted for this application? | Yes |