SSTS Operating Permit Permit # OP 2024-780, App. # 2024-001533, UID # 211758
Renewal of Permit # OP 780
App. Status: Approved
Valid: 07/10/2024 - 09/30/2029
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Applicant Information

Are you the property owner? Yes

Facility Information

Renewal Type:
5 Years
Permittee Contact Information (property owner):
Name:
Linda Dekanick Trustee
Phone:
(651343 - 4669
Email Address:
ledekanick@gmail.com
Mailing Address:
2043 PLEASANT VIEW DRIVE
NEW BRIGHTON MN 55112
Property Location:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
11-1-11770044572 230th Ln
AITKIN, MN 56431
HAZELTON TWPMAPLEWOODS:29 T:45 R:27RDBIG PINE LAKE (Hazelton)DEKANICK, LINDA E TRUSTEEDEKANICK, LINDA E TRUSTEE
System Type: Type 3
Treatment Level: C
Residential/Commercial: Residential
System Design Flow (gpd): 450 GPD
System Description:
4 Bedroom Type III Other Septic System with 3 foot sandbase mound under 10x37.5 rockbed time dosed to 3 Bdrm. Install effluent filter on septic tank outlet with alarm. Install event counter on system.

Service Provider

Attach Signed Maintenance Contract:
Select your Service Provider/Inspector/Maintainer:
NameLicense #ExpirationPhoneAddressInspectorInstallerMaintainerService Provider
Brummer Septic LLCL134705/20/2024218-821-070414650 Agate Ridge Rd, Brainerd MN 56401YesNoNoNo
Service Provider Email: brummerseptic@gmail.com

Monitoring Requirements

Monitoring Requirements:
ParameterEffluent LimitsFrequencyLocation
*Design Flow (gpd)450 gpdMonthlyEvent Counter
*Ponding/Surfacing in Soil TreatmentNoneAnnuallyDrainfield
Monitoring Requirements Comments:
Owner is responsible for monthly event counter readings.

Maintenance Requirements

Maintenance Requirements:
System ComponentMaintenanceFrequency
*Septic Tank/Trash TankCheck levels, pump as neededAnnually
*Pump Tank and ControlsCalibrate pump out gallonsAnnually
*Pump Tank and ControlsComponents and settingsAnnually
Effluent ScreenCheck and cleanAnnually
*Soil Treatment and DispersalCheck for surfacing/leaking/pondingAnnually

Renewal Files

Attach the Flow Readings and Monitoring/Maintenance Report from your Service Provider:

Terms

Monitoring Protocol
  • Any sampling and laboratory testing procedures shall be performed in accordance with the proprietary treatment product's protocol, Standard Methods, and at a Minnesota Department of Health approved laboratory. Results shall be submitted to the permitting authority at: Aitkin County Environmental Services, 307 2nd St NW, Room 219, Aitkin, MN 56431 no later than the expiration date listed.

Contingency Plan
  • In the event the wastewater treatment system does not meet required performance requirements as contained in this operating permit, the owner shall notify Aitkin County Environmental Services within thirty (30) days of receiving non-compliant information. The owner is responsible to obtain the services of a Minnesota Pollution Control Agency (MPCA) licensed Service Provider or other qualified practitioner to complete the required corrective measures

Authorization
  • Aitkin County Environmental Services authorizes the Permittee to operate a wastewater treatment and dispersal system at the address named above in accordance with the requirements of this operating permit, attached Management Plan and contract with the Service Provider/Inspector.

    This permit is effective on the issuance date identified above. This permit and the authorization to treat and disperse wastewater shall expire on the expiration date identified above. The Permittee is not authorized to discharge after the above date of expiration. The Permittee shall submit monitoring information on forms as required by Aitkin County Environmental Services no later than thirty (30) days prior to the above date of expiration for operating permit renewal. This permit is not transferable.

    The owner is required to obtain the services of a Minnesota Pollution Control Agency (MPCA) licensed and trained: 1) Service Provider or Inspector to provide ongoing system operation, maintenance, and monitoring and 2) Maintainer to pump the system's sewage tanks and components. The owner is responsible to provide the name of the Service Provider or Inspector business prior to the issuance of this operating permit. The owner has secured the services of [Named in Section 3] as the Service Provider or Inspector for this system. The Service Provider or Inspector is hereby authorized to provide the required monitoring data and routine maintenance service records to Aitkin County Environmental Services.

    [For systems that generate high strength wastewater, the following items should be added to the operating permit: 'If there is a change of use within the facility (i.e., change in menu, increase in food capacity, change in water use fixtures, etc.), the permittee is required to notify Aitkin County Environmental Services and the Service Provider before any changes occurs. Changes to the facility that could potentially impact performance of the wastewater treatment and dispersal system shall not take place until appropriate evaluation has been completed.']

    I hereby certify with my signature as the Permittee that I understand the provisions of the wastewater treatment and dispersal system operating permit including maintenance and monitoring requirements. I agree to indemnify and hold Aitkin County harmless from all loss, damages, costs and charges that may be incurred by the use of this system. I acknowledge that by submitting this application, the application and its attachments are public information. If I fail to comply with the provisions of this operation permit, I understand that penalties may be issued. If I sell this property during the life of the permit, I will inform the new owner(s) of the permit requirements and the need to renew the operating permit.

Invoice #60988 (07/03/2024)

Charge Cost Quantity Total
Non-Taxable
added 07/03/2024 11:21 AM

$150.00 x 1 $150.00
Grand Total
Total $150.00
Payment 07/10/2024$150.00
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantLinda Dekanick - 07/03/2024 11:22 AM - witnessed by Brock Anderson
7d5d8cb025947a711e763f8129ea9db5
6d47862ce7e71514d03720f7bb064ca6
 
#1 Planning & Zoning ApprovalBrock Anderson - 07/10/2024 11:12 AM
e39b9908694e3a070f961b86abc2aa7e
a4d6ec36403a52b5fb72c09c32cf4ead
 
Application has been approved. All signatures have been obtained.
Public Notes:
Attachments:
Expiration Date: 09/30/2029
Internal Notes:
Attachments:
    Powered by