OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
If we have questions on the application who should we contact? |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | No |
Property Owner Contact
Property Owner Phone Number: |
|
||||
Property Owner Email Address: | realestate@troyfelton.com |
Project Location Search
Property: |
|
Driving directions to the property from Aitkin.: | none needed |
Project Description
Please describe your proposed project: | remove 110 ft of ice ridge and hall away dirt and sod. re rip rap shore line black dirt and seed where needed |
Will you be removing vegetation during this project? | No |
Site Drawing(s)
Land Alteration Site Sketch Checklist: | Location and size of all existing structures. Location and size of all proposed structures. Location of all driveways and/or access roads. Location of wetlands. Location and size of alteration. Location of erosion control measures. Location of fill disposal, if done on site. Distance of alteration to OHWL (closest point) Distance of alteration to property lines. Distance of alteration to existing structures. Distance of alteration to proposed structures. Cross-section of cut and/or fill locations. |
Attach a copy of your Site Sketch(s): |
|
Excavation Details
Nature of Material to be used?
(Check all that apply) |
Black Dirt Rock |
Total Amount of Excavation and/or Fill proposed? (cubic yards) | 120 CuYd |
Total Area to be Graded and/or Filled? (L x W) | 1000 ft2 |
Attach a photo of the area to be altered (as it exists today).: |
|
Erosion Control Practices
Indicate the following erosion control measures that will be used throughout and after your project? (Check all that apply) |
Silt Fence Seeding and/or Mulching |
Describe how you intend to implement this plan and your finished vegetation plan.: |
use silt fence during work and black dirt seed and straw blanket when done |
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.
I acknowledge that by submitting this application, the application and its attachments are public information.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #60964 (06/30/2024)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 06/30/2024 6:52 PM $200 Flat Fee |
$200.00 | x 1 | $200.00 |
Grand Total | |||
Total | $200.00 | ||
Payment 06/30/2024 | $200.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Don Peterson - 07/02/2024 12:35 PM - witnessed by Henry Egland 13a3dbab3a11fd7b308f883681a0449b 19099e82581dc0f98c7d925ca90738a8 |
#1 Administrative Review | Henry Egland - 07/02/2024 12:36 PM 1271548b41dd36f95b3919d52344bcc7 8804e724794cf47a1d081083c0898182 |
#2 Inspector Review | Henry Egland - 07/02/2024 1:14 PM 5a47eeeba98517e66313201e9cb8e9de 267c9ac1365efa90cf932f93f2a8be0c |
#3 Final Approval | Connor Plagge - 07/03/2024 9:18 AM 6a9145a1d8a2c63b02480be74c0bd381 7d68cee61df879db4e1c71648876fca4 |
Public Notes
Text: | Permit #48825 Approved - Land alteration: Rip-rap and 1000 sq/ft of wetland fill. |
File(s): |
|
Internal Notes
Text: | |
File(s): |