OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
If we have questions on the application who should we contact? |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Project Location Search
Property: |
|
Driving directions to the property from Aitkin.: | North on Hwy 169 to Hwy 210. East on Hwy 210 to County Road 5. North on County Road 5 to 442nd Lane (North Jenkins Lake Rd). East on 442nd Lane to 29551 442nd Lane. |
Project Description
Please describe your proposed project: | Approximately 60 feet of shoreline will be altered to include approximately 8 to 10 feet for a boat ramp and 50 to 52 feet of rip rap. The remaining 90 feet of shoreline will be unaltered. Amount of rock for rip rap will be approximately 13 cubic yards and the amount of 1 and 1/2 inch crushed rock for the boat ramp will be approximately 1 yard. Approximately 5 yards of class five will be used for the approach to the boat ramp. Current erosion control is grass. After construction grass will be sewn as necessary above the rip rap as well as being allowed to grow up through the class five. Erosion control under the rip rap and crushed rock will be via fabric commonly used for such purposes. |
Will you be removing vegetation during this project? | No |
Site Drawing(s)
Land Alteration Site Sketch Checklist: | Location and size of all existing structures. Location of all driveways and/or access roads. Location and size of alteration. Location of erosion control measures. Distance of alteration to property lines. Distance of alteration to existing structures. Cross-section of cut and/or fill locations. |
Attach a copy of your Site Sketch(s): |
|
Excavation Details
Nature of Material to be used?
(Check all that apply) |
Black Dirt Gravel Rock Other (explain below) |
If other, please explain: | Class 5. |
Total Amount of Excavation and/or Fill proposed? (cubic yards) | 20 CuYd |
Total Area to be Graded and/or Filled? (L x W) | 420 ft2 |
Attach a photo of the area to be altered (as it exists today).: |
|
Erosion Control Practices
Indicate the following erosion control measures that will be used throughout and after your project? (Check all that apply) |
Seeding and/or Mulching Other (explain below) |
If other, please explain: | Filter blanket. |
Describe how you intend to implement this plan and your finished vegetation plan.: |
The filter blanket will be underlayment under the crushed rock fore the boat ramp and under the natural rock for the rip rap. All shoreline above the rip rap will be seeded as necessary. |
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.
I acknowledge that by submitting this application, the application and its attachments are public information.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #60847 (06/16/2024)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 06/16/2024 6:40 PM $200 Flat Fee |
$200.00 | x 1 | $200.00 |
Grand Total | |||
Total | $200.00 | ||
Payment 06/16/2024 | $200.00 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | David D. Quesenberry - 06/16/2024 6:44 PM c408f347850ebd3f0282eb840b57d468 0f4d514a82baa4bb4ea13949e8be1c70 | |
#1 Administrative Review | Henry Egland - 06/17/2024 8:27 AM 8692c86fcc6713e54798bed8d0a92f1f f79be491fb63f620e5906e05eb8b8178 | |
#2 Inspector Review | Henry Egland - 06/24/2024 9:35 AM 138043da1f201f0c443b37345e812b83 b7d3d4218e09165efe452ff2868fce73 | |
#3 Final Approval | Connor Plagge - 06/24/2024 12:22 PM 343dda5274907811c3f99a52ab29a50a 27fb980526278d1c204aca3aa0ba5e90 |
Text: | Permit #48799 Approved: Land Alteration - Boat ramp access. Rip-rap is not permitted; No current erosion was present during site visit. |
File(s): |
|
Text: | |
File(s): |
Date application was complete: | 06/17/2024 |
This review has been started by: | Henry Egland |
Zoning District of project location: | Shoreland |
Zoning Inspector: | Henry Egland |
Attach necessary inspection forms: |
|
Is the project in the Shore Impact Zone? | Yes |
Was an onsite conducted for this application? | Yes |
Is this an After-The-Fact application? | No |
Project located in the floodplain? | No |
Base Flood Elevation: |