Land Alteration Permit # 2024-0501, App. # 2024-001461, UID # 211609
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

If we have questions on the application who should we contact?
Name:
Dave Quesenberry
Phone:
(916801 - 3032
Email Address:
chiefdaveq@gmail.com
Mailing Address:
29551 442nd Lane
PO Box 127
Palisade MN 56469 2382
Are you the Property Owner? Yes

Project Location Search

Property:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
08-0-02121129551 442nd Ln
PALISADE, MN 56469
FLEMING TWPS:14 T:48 R:25RDJENKINS LAKEQUESENBERRY, DAVID & DANELLEQUESENBERRY, DAVID & DANELLE
Driving directions to the property from Aitkin.:
North on Hwy 169 to Hwy 210.  East on Hwy 210 to County Road 5.  North on County Road 5 to 442nd Lane (North Jenkins Lake Rd).  East on 442nd Lane to 29551 442nd Lane.

Project Description

Please describe your proposed project:
Approximately 60 feet of shoreline will be altered to include approximately 8 to 10 feet for a boat ramp and 50 to 52 feet of rip rap.  The remaining 90 feet of shoreline will be unaltered.  Amount of rock for rip rap will be approximately 13 cubic yards and the amount of 1 and 1/2 inch crushed rock for the boat ramp will be approximately 1 yard.  Approximately 5 yards of class five will be used for the approach to the boat ramp.  Current erosion control is grass.  After construction grass will be sewn as necessary above the rip rap as well as being allowed to grow up through the class five.  Erosion control under the rip rap and crushed rock will be via fabric commonly used for such purposes.
Will you be removing vegetation during this project? No

Site Drawing(s)

Land Alteration Site Sketch Checklist:
Location and size of all existing structures.
Location of all driveways and/or access roads.
Location and size of alteration.
Location of erosion control measures.
Distance of alteration to property lines.
Distance of alteration to existing structures.
Cross-section of cut and/or fill locations.
Attach a copy of your Site Sketch(s):

Excavation Details

Nature of Material to be used?
(Check all that apply)
Black Dirt
Gravel
Rock
Other (explain below)
If other, please explain:
Class 5.
Total Amount of Excavation and/or Fill proposed? (cubic yards) 20 CuYd
Total Area to be Graded and/or Filled? (L x W) 420 ft2
Attach a photo of the area to be altered (as it exists today).:

Erosion Control Practices

Indicate the following erosion control measures that
will be used throughout and after your project?
(Check all that apply)
Seeding and/or Mulching
Other (explain below)
If other, please explain:
Filter blanket.
Describe how you intend to implement this plan
and your finished vegetation plan.:
The filter blanket will be underlayment under the crushed rock fore the boat ramp and under the natural rock for the rip rap.  All shoreline above the rip rap will be seeded as necessary.

Terms

General Terms Zoning Permits
  • All appropriate permit fees must be paid in full prior to any necessary review(s) of application.

  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

  • To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.

  • I acknowledge that by submitting this application, the application and its attachments are public information.

Land Use/Septic General Terms
  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

Invoice #60847 (06/16/2024)

Charge Cost Quantity Total
Non-Taxable
added 06/16/2024 6:40 PM

$200 Flat Fee

$200.00 x 1 $200.00
Grand Total
Total $200.00
Payment 06/16/2024$200.00
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantDavid D. Quesenberry - 06/16/2024 6:44 PM
c408f347850ebd3f0282eb840b57d468
0f4d514a82baa4bb4ea13949e8be1c70
 
#1 Administrative ReviewHenry Egland - 06/17/2024 8:27 AM
8692c86fcc6713e54798bed8d0a92f1f
f79be491fb63f620e5906e05eb8b8178
 
#2 Inspector ReviewHenry Egland - 06/24/2024 9:35 AM
138043da1f201f0c443b37345e812b83
b7d3d4218e09165efe452ff2868fce73
 
#3 Final ApprovalConnor Plagge - 06/24/2024 12:22 PM
343dda5274907811c3f99a52ab29a50a
27fb980526278d1c204aca3aa0ba5e90
 
Application has been approved. All signatures have been obtained.
Text:
Permit #48799

Approved: Land Alteration - Boat ramp access.

Rip-rap is not permitted; No current erosion was present during site visit.
File(s):
Text:
File(s):
    Date application was complete: 06/17/2024
    This review has been started by: Henry Egland
    Zoning District of project location: Shoreland
    Zoning Inspector: Henry Egland
    Attach necessary inspection forms:
    Is the project in the Shore Impact Zone? Yes
    Was an onsite conducted for this application? Yes
    Is this an After-The-Fact application? No
    Project located in the floodplain? No
    Base Flood Elevation:
    Powered by