Land Use Application App. # 2024-001337, UID # 211386
App. Status: Denied
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

Enter Applicant Contact Information:
Name:
Keith Boe
Phone:
(763438 - 9807
Email Address:
keithboe@live.com
Mailing Address:
17639 329th PL
Isle MN 56342
Are you the Property Owner? Yes

Property Location

Property Location:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
16-1-07260017639 329th Pl
ISLE, MN 56342
LAKESIDE TWPTIMBER SHORESS:29 T:44 R:25GDMILLE LACSBOE, KEITH & KETKEOMANYBOE, KEITH & KETKEOMANY

Project Checklist

1.) Is the property zoned Shoreland? Yes
3.) Are there any wetlands or lowlands on/near the project site? No
4.) Will the structure(s) be used for commercial purposes? No
5.) Is there an existing septic system on the property?
(Outhouse/Privies are also considered septic systems)
Yes
6.) Are you applying to install a new septic system? No

Existing Septic Status

Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? Yes

Project Description

Please describe your proposed project:
Proposed 28? x 28? garage addition over existing driveway

Project Type

Item 1 - Structure Type: Residence Addition
Item 1 - Type of Construction: Wood/Frame
Item 1 - Size: 28 ft2
Item 2- Structure Type (if applicable): Residence Addition
Item 2 - Type of Construction: Wood/Frame

Shoreland Data

Setback distance from Ordinary High Water Level to the proposed construction? (closest point) 130 Feet
Will the proposed structure(s) be less than 35 foot maximum height? Yes
Are you constructing a walkout basement? No

Natural Landscape Protection Plan

Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? No
(If yes, please attach plan):
How many cubic yards of fill or excavation will be done on the property? 3 CuYd
How close to the property line will any fill be placed or any excavation be done? 60 Feet
What percent slope of the land currently exists on the project site? 3 % slope
Select the erosion control methods that will be used throughout and after your project:
(Check all that apply)
Silt Fence
Seeding and/or Mulching

Site Plan

Attach Site Plan:
Is the site staked and ready for inspection? Yes

Terms

Land Use/Septic Terms & Conditions
  • All appropriate permit fees must be paid in full prior to review of the application.
    Permit fees are non-refundable after a permit is approved.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
    Property lines need to be clearly marked or staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
    Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."

  • Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

  • I acknowledge that by submitting this application, the application and its attachments are public information.

Invoice #60644 (05/28/2024)

Charge Cost Quantity Total
Non-Taxable
added 05/28/2024 8:58 AM

$300 Flat Fee

$300.00 x 1 $300.00
Grand Total
Total $300.00
Payment 05/28/2024$300.00
Due$0.00

Approvals

ApprovalSignature
ApplicantKeith A. Boe - 05/28/2024 9:01 AM
0c3670b886df335302549c91f10a8636
67d47831b8f2d2bddca6ab6752801588

Public Notes

Text:
Refund issued 7/22/24 KB
File(s):

    Admin Checklist

    Date application was complete:
    Review started by:
    Zoning District of project location:
    Required OWHL setback distance:
    "Other" OHWL setback distance is:
    Project located in the floodplain?
    Base Flood Elevation:
    Lowest Floor Elevation:
    Is an after construction elevation certificate required?
    Property line setbacks appear to be met?
    Road R-O-W setbacks appear to be met?
    Bluff setbacks appear to be met?
    Septic Tank setback appears to be met with/without an engineer's report?
    Septic Drainfield setback appears to be met with/without an engineer's report?
    Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified?
    Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot?
    Is this After-The-Fact?

    Inspector Checklist

    Zoning Inspector:
    Attach necessary inspection forms/photos:
      Notes:
      Was an onsite conducted for this application?
      Powered by