OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Enter Applicant Contact Information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Property Location
Property Location: |
|
Project Checklist
1.) Is the property zoned Shoreland? | No |
3.) Are there any wetlands or lowlands on/near the project site? | No |
4.) Will the structure(s) be used for commercial purposes? | No |
5.) Is there an existing septic system on the property? (Outhouse/Privies are also considered septic systems) |
Yes |
6.) Are you applying to install a new septic system? | No |
Existing Septic Status
Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? | Yes |
Project Description
Please describe your proposed project: | 28 x 40 american steel garage 10 x 16 deck on house |
Project Type
Item 1 - Structure Type: | Accessory Building |
Item 1 - Type of Construction: | Wood/Frame |
Item 1 - Size: | 1120 ft2 |
Item 2- Structure Type (if applicable): | Deck/Patio |
Item 2 - Type of Construction: | Wood/Frame |
Item 2 - Size: | 160 ft2 |
Site Plan
Please include all applicable items from the checklist on your site plan. See example site plan below: | All Existing Structures & Dimensions |
Attach Site Plan: |
|
Is the site staked and ready for inspection? | Yes |
Terms
All appropriate permit fees must be paid in full prior to review of the application.
Permit fees are non-refundable after a permit is approved.It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
Property lines need to be clearly marked or staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
I acknowledge that by submitting this application, the application and its attachments are public information.
Invoice #60635 (05/24/2024)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 05/24/2024 10:27 AM $300 Flat Fee |
$300.00 | x 1 | $300.00 |
added 05/24/2024 10:27 AM $100 Flat Fee |
$100.00 | x 1 | $100.00 |
Grand Total | |||
Total | $400.00 | ||
Payment 05/24/2024 | $400.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Ernie Samson - 05/24/2024 10:58 AM - witnessed by Brock Anderson 8be80535178387e52d41a7f70abf8162 2be7718ac8d6ee2149fcf4175ddb8f5d |
#1 Adminstrative Approval Group | Connor Plagge - 05/24/2024 3:00 PM f3c7e5e03a35ecaaacac743fcd306d5e 8f3e0ba0a8834bbfe0e2255ff5ce86a8 |
#2 Inspector Group | Connor Plagge - 05/24/2024 3:03 PM a4a408eb65feb05b20b2d5ee15079d38 17159ed50acc904cb47e1b0e9083746a |
#3 Level Three Final Action | Connor Plagge - 05/30/2024 8:47 AM 05f26b2bf309cb65e043f3a8497322f6 37762332fcfc67aaae0d3e3af5180c2a |
Public Notes
Text: | Permit #48690 Approved for a 1120 sq ft Accessory Building and a 160 sq ft Deck. |
File(s): |
|
Admin Checklist
Date application was complete: | 05/24/2024 |
Review started by: | Connor Plagge |
Zoning District of project location: | Farm Residential |
Required OWHL setback distance: | |
"Other" OHWL setback distance is: | |
Project located in the floodplain? | No |
Base Flood Elevation: | |
Lowest Floor Elevation: | |
Is an after construction elevation certificate required? | |
Property line setbacks appear to be met? | Yes |
Road R-O-W setbacks appear to be met? | Yes |
Bluff setbacks appear to be met? | N/A |
Septic Tank setback appears to be met with/without an engineer's report? | Yes |
Septic Drainfield setback appears to be met with/without an engineer's report? | Yes |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? | Redevelopment |
Is this After-The-Fact? | No |
Inspector Checklist
Zoning Inspector: | Connor Plagge |
Attach necessary inspection forms/photos: | |
Notes: | Verified using GIS |
Was an onsite conducted for this application? | Yes |