Land Use Application Permit # 2024-0347, App. # 2024-001313, UID # 211343
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

Enter Applicant Contact Information:
Name:
Chad Boyce
Phone:
(612208 - 2165
Email Address:
chadboyce@wolfriverelectric.com
Mailing Address:
101 Isanti Parkway Northeast
Suite G
Isanti MN 55040
Are you the Property Owner? No

Property Owner Contact

Property Owner Email: stevebeckym@gmail.com
Property Owner Phone:
(218251 - 6160

Property Location

Property Location:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
24-1-09520032865 382ND PL
AITKIN MN 56431
NORDLAND TWPNORD ACRESS:8 T:46 R:26RDNORD LAKEMICHALETZ, STEPHEN & REBECCAMICHALETZ, STEPHEN & REBECCA

Project Checklist

1.) Is the property zoned Shoreland? No
3.) Are there any wetlands or lowlands on/near the project site? No
4.) Will the structure(s) be used for commercial purposes? No
5.) Is there an existing septic system on the property?
(Outhouse/Privies are also considered septic systems)
No
6.) Are you applying to install a new septic system? No

Project Description

Please describe your proposed project:
Ground mounted solar pv with utility interconnection

Project Type

Item 1 - Structure Type: Accessory Building
Item 1 - Type of Construction: Wood/Frame
Item 1 - Size: 831 ft2

Site Plan

Attach Site Plan:
Is the site staked and ready for inspection? Yes

Additional Info

Additional info:
(optional)
Residential ground mounted solar Pv system with utility interconnection 

Please call me with any questions

Terms

Land Use/Septic Terms & Conditions
  • All appropriate permit fees must be paid in full prior to review of the application.
    Permit fees are non-refundable after a permit is approved.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
    Property lines need to be clearly marked or staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
    Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."

  • Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

  • I acknowledge that by submitting this application, the application and its attachments are public information.

Invoice #60606 (05/22/2024)

Charge Cost Quantity Total
Non-Taxable
added 05/22/2024 2:04 PM

$200 Flat Fee

$200.00 x 1 $200.00
Grand Total
Total $200.00
Payment 05/22/2024$200.00
Due$0.00

Approvals

ApprovalSignature
ApplicantChad Boyce - 05/22/2024 2:05 PM
7b116db5b7684e1476ff5e1e9bcfccf6
a841d655c2696722313bfdf505ea9d5b
#1 Adminstrative Approval GroupBrock Anderson - 05/23/2024 8:54 AM
4a4783113e6b6b0a7e0472046caff974
643592b0cdb92ae2c4279f835384501e
#2 Inspector GroupBrock Anderson - 05/24/2024 12:03 PM
e78d5107e5c71b3b46892e6615934333
94d2610d03210615e2d1917370408320
#3 Level Three Final ActionConnor Plagge - 05/24/2024 4:28 PM
dd5e861cf6d3252a193a30b9d8508876
35cf31114764b20a42d2e35bb980220d
Application has been approved. All signatures have been obtained.

Public Notes

Text:
Permit #48685

Approved for 831 sq ft Accessory Building (Ground Mounted Solar Units)
File(s):

Admin Checklist

Date application was complete: 05/22/2024
Review started by: Brock Anderson
Zoning District of project location: Shoreland
Required OWHL setback distance:
"Other" OHWL setback distance is:
Project located in the floodplain? No
Base Flood Elevation:
Lowest Floor Elevation:
Is an after construction elevation certificate required?
Property line setbacks appear to be met? No
Road R-O-W setbacks appear to be met? Yes
Bluff setbacks appear to be met? N/A
Septic Tank setback appears to be met with/without an engineer's report? Yes
Septic Drainfield setback appears to be met with/without an engineer's report? Yes
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? Yes
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? Redevelopment
Is this After-The-Fact? No

Inspector Checklist

Zoning Inspector: Brock Anderson
Attach necessary inspection forms/photos:
Notes:
Was an onsite conducted for this application? Yes
Powered by