Land Use Application Permit # 2024-0415, App. # 2024-001287, UID # 211263
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

Enter Applicant Contact Information:
Name:
Daniel Ralph Kyllo
Phone:
(651206 - 0532
Email Address:
dan.kyllo@comcast.net
Mailing Address:
1891
Oldridge Ave N
Stillwater MN 55082
Are you the Property Owner? Yes

Property Location

Property Location:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
32-1-06630052729 185th Pl
MCGREGOR, MN 55760
TURNER TWPBIG SANDY LAKE HIGHLANDS FIFTH ADDITIONS:34 T:50 R:23GDBIG SANDY LAKEKYLLO, DANIEL & JENNIFER TRUSTEESKYLLO, DANIEL & JENNIFER TRUSTEES

Project Checklist

1.) Is the property zoned Shoreland? Yes
3.) Are there any wetlands or lowlands on/near the project site? Yes
4.) Will the structure(s) be used for commercial purposes? No
5.) Is there an existing septic system on the property?
(Outhouse/Privies are also considered septic systems)
Yes
6.) Are you applying to install a new septic system? No

Existing Septic Status

Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? Yes

Project Description

Please describe your proposed project:
Proposing to build a 32' x 48' metal pole building, accessory structure.

Project Type

Item 1 - Structure Type: Accessory Building
Item 1 - Type of Construction: Pole Bldg
Item 1 - Size: 1536 ft2
Item 2- Structure Type (if applicable): Deck/Patio
Item 2 - Type of Construction: Wood/Frame
Item 2 - Size: 240 ft2

Shoreland Data

Setback distance from Ordinary High Water Level to the proposed construction? (closest point) 130 Feet
Will the proposed structure(s) be less than 35 foot maximum height? Yes
Are you constructing a walkout basement? No

Natural Landscape Protection Plan

Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? No
(If yes, please attach plan):
How many cubic yards of fill or excavation will be done on the property? 200 CuYd
How close to the property line will any fill be placed or any excavation be done? 20 Feet
What percent slope of the land currently exists on the project site? 12.5 % slope
Select the erosion control methods that will be used throughout and after your project:
(Check all that apply)
Sediment Control Logs
Seeding and/or Mulching

Site Plan

Please include all applicable items from the checklist on your site plan. See example site plan below:
All Existing Structures & Dimensions
All Proposed Structures & Dimensions
Location of Driveways & Access Roads
Location of Well(s)
Location of Septic System(s)
Distance of Proposed Structures to OHWL (closest point)
Distance of Proposed Structures to Septic System(s)
Distance of Proposed Structures to Property Lines
Distance of Proposed Structures to Road Right-of-Way
Attach Site Plan:
Is the site staked and ready for inspection? Yes

Additional Info

Additional info:
(optional)
Darlow Excavating submitted my septic system design and plan to the county on 5/16/2024.

Terms

Land Use/Septic Terms & Conditions
  • All appropriate permit fees must be paid in full prior to review of the application.
    Permit fees are non-refundable after a permit is approved.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
    Property lines need to be clearly marked or staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
    Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."

  • Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

  • I acknowledge that by submitting this application, the application and its attachments are public information.

Invoice #60543 (05/17/2024)

Charge Cost Quantity Total
Non-Taxable
added 05/15/2024 1:19 PM

$300 Flat Fee

$300.00 x 1 $300.00
added 06/05/2024 10:55 AM

$150 Flat Fee

$150.00 x 1 $150.00
Grand Total
Total $450.00
Payment 05/17/2024$300.00
Payment 06/06/2024$150.00
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantDaniel R. Kyllo - 05/17/2024 3:07 PM
5562de380033caa350c4cc474b9f81d6
ca57582bc7ab302526e1851d3f9948c7
 
#1 Adminstrative Approval GroupConnor Plagge - 06/05/2024 11:00 AM
4da5440b3b80911a7d362ff0c664174d
275ca1e13bc026f151dde2c1a2feaa0c
 
#2 Inspector ReviewConnor Plagge - 06/07/2024 4:02 PM
8daac8d759cee7553719c14a2d96d275
c39cdcb16517a8fa756447efebe31b4e
 
#3 Final ApprovalConnor Plagge - 06/10/2024 1:04 PM
c3d0de0a6b604f3dfd2338b4772116f6
d778dcabda4809c70c3dae58a23a68e2
 
Application has been approved. All signatures have been obtained.
Text:
Permit #48732

Approved for a 1536 sq ft Accessory Building (32'x48') and a 240 sq ft Deck with Condition: 
     1. Deck must be moved to meet setback (currently at 55' from OHWL, 75' required) within one year from permit issuance.
File(s):
Text:
File(s):
    Date application was complete: 05/17/2024
    Review started by: Connor Plagge
    Zoning District of project location: Shoreland
    Required OWHL setback distance: 75 ft.
    "Other" OHWL setback distance is:
    Project located in the floodplain? No
    Base Flood Elevation:
    Lowest Floor Elevation:
    Is an after construction elevation certificate required?
    Property line setbacks appear to be met? Yes
    Road R-O-W setbacks appear to be met? Yes
    Bluff setbacks appear to be met? N/A
    Septic Tank setback appears to be met with/without an engineer's report? Yes
    Septic Drainfield setback appears to be met with/without an engineer's report? Yes
    Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? Yes
    Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? Redevelopment
    Is this After-The-Fact? No
    Zoning Inspector:
    SSTS Type:
    SSTS Design:
    New or Replacement SSTS:
    GPD:
    # of bedrooms:
    Does this system require an Operating Permit?
    Operating Permit #:
    Does this system belong to an other establishment?
    Is this a Cluster System?
    Attachments:
      Zoning Inspector: Connor Plagge
      Attach necessary inspection forms/photos:
      Notes:
      Was an onsite conducted for this application? Yes
      Self Install?
      Installer Name:
      None
      New Tanks:
      Existing Tanks:
      Date of Final Inspection:
      Attach Final Certificate of Installation:
        Low Interest Loan or SSTS Grant project?