Land Use Application Permit # 2024-0318, App. # App-2024-001128, UID # 211035
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

Enter Applicant Contact Information:
Name:
Nathan K Johnson
Phone:
(612749 - 0657
Email Address:
01nathanjohnson@gmail.com
Mailing Address:
48295 235th pl
Mcgregor MN 55760
Are you the Property Owner? Yes

Property Location

Property Location:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
39-0-04030248295 235TH PL
MCGREGOR MN 55760
WORKMAN TWPS:23 T:49 R:24RDRAT LAKEJOHNSON, NATHAN & CHRISTINEJOHNSON, NATHAN & CHRISTINE

Project Checklist

1.) Is the property zoned Shoreland? Yes
3.) Are there any wetlands or lowlands on/near the project site? No
4.) Will the structure(s) be used for commercial purposes? No
5.) Is there an existing septic system on the property?
(Outhouse/Privies are also considered septic systems)
Yes
6.) Are you applying to install a new septic system? No

Existing Septic Status

Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? Yes

Project Description

Please describe your proposed project:
Building an accessory structure 30 x 32 feet behind house.

Project Type

Item 1 - Structure Type: Accessory Building
Item 1 - Type of Construction: Pole Bldg
Item 1 - Size: 960 ft2
Item 2- Structure Type (if applicable): Water Oriented Accessory Structure
Item 2 - Type of Construction: Wood/Frame
Item 2 - Size: 120 ft2

Shoreland Data

Setback distance from Ordinary High Water Level to the proposed construction? (closest point) 75 Feet
Will the proposed structure(s) be less than 35 foot maximum height? Yes
Are you constructing a walkout basement? No
If you are building an accessory structure, will there will be a loft or second story? No

Natural Landscape Protection Plan

Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? Yes
(If yes, please attach plan):
How many cubic yards of fill or excavation will be done on the property? 45 CuYd
How close to the property line will any fill be placed or any excavation be done? 12 Feet
What percent slope of the land currently exists on the project site? 20 % slope
Select the erosion control methods that will be used throughout and after your project:
(Check all that apply)
Silt Fence
Seeding and/or Mulching
Tree Planting
Other (explain below)
Other:
behind accessory building a retaining wall

Site Plan

Please include all applicable items from the checklist on your site plan. See example site plan below:
Location of Well(s)
Distance of Proposed Structures to OHWL (closest point)
Attach Site Plan:
Is the site staked and ready for inspection? Yes

Additional Info

Additional info:
(optional)
water orientated structure 75 feet from shore.
Attachments: (e.g. blueprints, floor plan, compliance inspection, or other information)

Terms

Land Use/Septic Terms & Conditions
  • All appropriate permit fees must be paid in full prior to any necessary review(s) of application.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.

  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • Permit fees are non-refundable after a permit is approved.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."

  • Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

  • I acknowledge that by submitting this application, the application and its attachments are public information.

Invoice #60334 (04/19/2024)

Charge Cost Quantity Total
Non-Taxable
added 04/19/2024 10:42 AM

$200 Flat Fee

$200.00 x 1 $200.00
added 04/19/2024 10:45 AM

$200 Flat Fee

$200.00 x 1 $200.00
Grand Total
Total $400.00
Payment 04/19/2024$400.00
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantNathan K. Johnson - 04/19/2024 3:52 PM
5f70ef718f2ac5c5f6361316cc8cc48e
357b392e39e92e88cb9a2b4d6b2f97e1
 
#1 Adminstrative Approval GroupJody Grund - 05/16/2024 9:59 AM
7170acc97e93c9bab772d20f19b32f48
5168ce7fc46c76ebb8dc47584754c501
 
#2 Inspector GroupJody Grund - 05/17/2024 3:31 PM
18208f17b425a84db64054fa57e1bd28
585bc203abdf6a16b0275406944119bb
 
#3 Level Three Final ActionConnor Plagge - 05/20/2024 9:07 AM
4acfc60f312fdfebc6d4e09039a3fc59
ca7c5c8b8f81f8108f0096ab295c8973
 
Application has been approved. All signatures have been obtained.
Text:
Permit #48661

Approved for a 960 sq ft Accessory Building and a 120 sq ft Water-Oriented Accessory Building
File(s):
Text:
Add retaining wall by house onto site plan
File(s):
    Date application was complete: 04/19/2024
    Review started by: Jody Grund
    Zoning District of project location: Shoreland
    Required OWHL setback distance: 100 ft.
    "Other" OHWL setback distance is:
    Project located in the floodplain? No
    Base Flood Elevation:
    Lowest Floor Elevation:
    Is an after construction elevation certificate required? No
    Property line setbacks appear to be met? Yes
    Road R-O-W setbacks appear to be met? Yes
    Bluff setbacks appear to be met? Yes
    Septic Tank setback appears to be met with/without an engineer's report? Yes
    Septic Drainfield setback appears to be met with/without an engineer's report? Yes
    Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? Yes
    Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? Redevelopment
    Is this After-The-Fact? No
    Zoning Inspector:
    SSTS Type:
    SSTS Design:
    New or Replacement SSTS:
    GPD:
    # of bedrooms:
    Does this system require an Operating Permit?
    Operating Permit #:
    Does this system belong to an other establishment?
    Is this a Cluster System?
    Attachments:
      Zoning Inspector: Jody Grund
      Attach necessary inspection forms/photos:
      Notes:
      Approved for a accessory structure 30 x 32 feet and 10x12 WAOS
      Was an onsite conducted for this application? Yes
      Self Install?
      Installer Name:
      None
      New Tanks:
      Existing Tanks:
      Date of Final Inspection:
      Attach Final Certificate of Installation:
        Low Interest Loan or SSTS Grant project?
        Powered by