OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
If we have questions on the application who should we contact? |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Project Location Search
Property: |
|
Driving directions to the property from Aitkin.: | take 210 east to 65 take that north, take left or east on 657th, take left or north on Martin road, take left on edblad road(672nd), go partially around vanduse lake and site is on left side of road. |
Project Description
Please describe your proposed project: | excavating area and installing class 5 base for a proposed garage. silt fence will be put up around site after seeding and straw blankets will be installed |
Will you be removing vegetation during this project? | Yes |
Site Drawing(s)
Land Alteration Site Sketch Checklist: | Location and size of all existing structures. Location and size of all proposed structures. Location of all driveways and/or access roads. Location of wetlands. Location and size of alteration. Location of erosion control measures. Location of fill disposal, if done on site. Distance of alteration to OHWL (closest point) Distance of alteration to property lines. Distance of alteration to existing structures. Distance of alteration to proposed structures. Cross-section of cut and/or fill locations. |
Attach a copy of your Site Sketch(s): |
|
Vegetation Removal
Number of Trees to be removed: | 15 |
Number of Shrubs to be removed: | 0 |
Type of Clearing Used?
(Check all that apply) |
Mechanical Clearing Hand Clearing |
Please explain: | chain saw to cut trees and a machine to remove |
Excavation Details
Nature of Material to be used?
(Check all that apply) |
Gravel |
Total Amount of Excavation and/or Fill proposed? (cubic yards) | 100 CuYd |
Total Area to be Graded and/or Filled? (L x W) | 6000 ft2 |
Attach a photo of the area to be altered (as it exists today).: |
|
Erosion Control Practices
Indicate the following erosion control measures that will be used throughout and after your project? (Check all that apply) |
Silt Fence Seeding and/or Mulching |
Describe how you intend to implement this plan and your finished vegetation plan.: |
put silt fence around site during construction after install grass seed and straw blankets to prevent erosion |
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.
I acknowledge that by submitting this application, the application and its attachments are public information.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #60283 (04/15/2024)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 04/15/2024 10:05 AM $200 Flat Fee |
$200.00 | x 1 | $200.00 |
Grand Total | |||
Total | $200.00 | ||
Payment 04/15/2024 | $200.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Ken Boyd - 04/15/2024 10:06 AM e72bd84799d445c53b389ed65708d761 259e79c9b895385b56611bef57b474f1 |
#1 Adminstrative Approval Group | Connor Plagge - 04/15/2024 2:19 PM 8d067e16da58638d3ef228b28b413f95 aa8a0f92c81d03d43f60b41a0bb0bf85 |
#2 Inspector Group | Connor Plagge - 04/17/2024 9:24 AM 0cb5fb31d14accd8b62afefe5dcaf528 2c6d1d857e09875a32e2aa217e409fd0 |
#3 Final Action | Connor Plagge - 04/17/2024 9:34 AM b4c403168dfa2c35fab4a0cf0395ef01 ce9a510f2a79a78ccf7a5301d244f704 |
Public Notes
Text: | Permit #48561 Approved for Land Alteration |
File(s): |
|
Internal Notes
Text: | |
File(s): |