SSTS Operating Permit Permit # OP 797, App. # App-2024-000998, UID # 210823
App. Status: Approved
Valid: 03/29/2024 - 09/30/2025
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Applicant Information

Are you the property owner? Yes

Facility Information

Permit Type:
Initial Application
Permittee Contact Information (property owner):
Name:
Mille Lacs Band of Chippewa Attn: Carla Dunkley
Phone:
(218768 - 3808
Email Address:
carla.dunkley@millelacsband.com
Mailing Address:
43408 Oodena Drive
Onamia MN 56359
Property Location:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
30-0-03320220954 363rd Ln
MCGREGOR, MN 55760
SPALDING TWPS:20 T:47 R:23MILLE LACS BAND OF CHIPPEWAMILLE LACS BAND OF CHIPPEWA
System Type: Type 3
Treatment Level: A
Residential/Commercial: Residential
System Design Flow (gpd): 750 gpd
System Description:
System is a 5 bedroom Type III Mound, 53'x107' with rockbed size of 62.5'x10'. Also (2) 2500 gallon tanks installed, per design. Type III system due to 3' sand lift under rockbed.

Service Provider

Attach Signed Maintenance Contract:
Select your Service Provider/Inspector/Maintainer:
NameLicense #ExpirationPhoneAddressInspectorInstallerMaintainerService Provider
E-Z Excavating LLCL147210/13/2024320-679-4031 1520 Maple Ave E, Mora MN 55051NoYesNoNo
Service Provider Email: ezexcavatingllc@yahoo.com

Monitoring Requirements

Monitoring Requirements:
ParameterEffluent LimitsFrequencyLocation
*Design Flow (gpd)750 gpdMonthlyEvent Counter
*Ponding/Surfacing in Soil TreatmentNoneAnnuallyMound

Maintenance Requirements

Maintenance Requirements:
System ComponentMaintenanceFrequency
*Pump Tank and ControlsCalibrate pump out gallonsAnnually
*Pump Tank and ControlsCheck functionsAnnually
Effluent ScreenCheck and cleanAnnually
*Soil Treatment and DispersalCheck for surfacing/leakingAnnually

Terms

Monitoring Protocol
  • Aitkin County Environmental Services authorizes the Permittee to operate a wastewater treatment and dispersal system at the address named above in accordance with the requirements of this operating permit, attached Management Plan and contract with the Service Provider/Inspector.

    This permit is effective on the issuance date identified above. This permit and the authorization to treat and disperse wastewater shall expire on the expiration date identified above. The Permittee is not authorized to discharge after the above date of expiration. The Permittee shall submit monitoring information on forms as required by Aitkin County Environmental Services no later than thirty (30) days prior to the above date of expiration for operating permit renewal. This permit is not transferable.

    The owner is required to obtain the services of a Minnesota Pollution Control Agency (MPCA) licensed and trained: 1) Service Provider or Inspector to provide ongoing system operation, maintenance, and monitoring and 2) Maintainer to pump the system's sewage tanks and components. The owner is responsible to provide the name of the Service Provider or Inspector business prior to the issuance of this operating permit. The owner has secured the services of [Name of Service Provider or Inspector] as the Service Provider or Inspector for this system. The Service Provider or Inspector is hereby authorized to provide the required monitoring data and routine maintenance service records to Aitkin County Environmental Services.

    [For systems that generate high strength wastewater, the following items should be added to the operating permit: 'If there is a change of use within the facility (i.e., change in menu, increase in food capacity, change in water use fixtures, etc.), the permittee is required to notify Aitkin County Environmental Services and the Service Provider before any changes occurs. Changes to the facility that could potentially impact performance of the wastewater treatment and dispersal system shall not take place until appropriate evaluation has been completed.']

    I hereby certify with my signature as the Permittee that I understand the provisions of the wastewater treatment and dispersal system operating permit including maintenance and monitoring requirements. I agree to indemnify and hold Aitkin County harmless from all loss, damages, costs and charges that may be incurred by the use of this system. If I fail to comply with the provisions of this operation permit, I understand that penalties may be issued. If I sell this property during the life of the permit, I will inform the new owner(s) of the permit requirements and the need to renew the operating permit.

Contingency Plan
  • In the event the wastewater treatment system does not meet required performance requirements as contained in this operating permit, the owner shall notify Aitkin County Environmental Services within thirty (30) days of receiving non-compliant information. The owner is responsible to obtain the services of a Minnesota Pollution Control Agency (MPCA) licensed Service Provider or other qualified practitioner to complete the required corrective measures

Authorization
  • Any sampling and laboratory testing procedures shall be performed in accordance with the proprietary treatment product's protocol, Standard Methods, and at a Minnesota Department of Health approved laboratory. Results shall be submitted to the permitting authority at: Aitkin County Environmental Services, 307 2nd St NW, Room 219, Aitkin, MN 56431 no later than the expiration date listed.

Invoice #60141 (03/29/2024)

Charge Cost Quantity Total
Non-Taxable
added 03/29/2024 3:08 PM

$150.00 x 1 $150.00
Grand Total
Total $150.00
Payment 03/29/2024$150.00
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantMille Lacs Band of Chippewa Attn: Carla Dunkley - 03/29/2024 3:08 PM - witnessed by Shannon Wiebusch
23c4ec44643d205c944dc1d44633c17c
460a50e40a6085274eaf18ea2a3bf1cd
 
#1 Planning & ZoningShannon Wiebusch - 03/29/2024 3:09 PM
f21c1bddabefb66d268996f252746697
24f2971891dadc79d5567d09191b0b67
 
Application has been approved. All signatures have been obtained.
Public Notes:
10/28/24 Received report and letter attached. SW
Attachments:
Expiration Date: 09/30/2025
Internal Notes:
Attachments:
    Powered by