SSTS Operating Permit Permit # OP 350-2019, App. # App-2024-000989, UID # 210812
Renewal of Permit # OP 350
App. Status: Renewed
Valid: 05/10/2024 - 09/30/2024
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Applicant Information

Are you the property owner? Yes

Facility Information

Renewal Type:
5 Years
Permittee Contact Information (property owner):
Name:
Darin Hill
Phone:
(970626 - 5811
Email Address:
ap@mymarketstores.com
Mailing Address:
490 Sherman St
Ridgway CO 81432
Property Location:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
14-0-04180241561 STATE HWY 65
MCGREGOR, MN 55760
JEVNE TWPS:25 T:48 R:24ABN MCGREGOR PARTNERS LLCABN MCGREGOR PARTNERS LLC
System Type: Type 4
Treatment Level: C
Residential/Commercial: Commercial
System Design Flow (gpd): 1200
System Description:
Sewage will flow by gravity to three 1960 gallon septic tanks. The third septic tank will have a VBT 200 model aerator mounted in the inlet side of the tank to treat the wastewater to residential strength. The outlet side of the tank will have a PL 525 polylock commercial effluent filter to prevent solids from moving forward. The last tank will be a duplex timed dose lift station which will dose a 10' x 100' rockbed mound.

Service Provider

Attach Signed Maintenance Contract:
Select your Service Provider/Inspector/Maintainer:
NameLicense #ExpirationPhoneAddressInspectorInstallerMaintainerService Provider
Septic CheckL262402/21/2026320-983-2447 6074 Keystone Rd, Milaca MN 56353YesYesYesYes
Service Provider Email: info@septiccheck.com

Monitoring Requirements

Monitoring Requirements:
ParameterEffluent LimitsFrequencyLocation
*Design Flow (gpd)1200 GPDAnnuallyFlow Meter
*Ponding/Surfacing in Soil TreatmentNone AllowedAnnuallyDrainfield
CBOD5 (mg/L)125 mg/lAnnuallyPump Control
TSS (mg/L)65 mg/lAnnuallyLift Station
Monitoring Requirements Comments:
Monitoring will be done by Septic Check

Maintenance Requirements

Maintenance Requirements:
System ComponentMaintenanceFrequency
*Septic Tank/Trash TankCheck and pump if neededAnnually
*Pump Tank and ControlsCheck and calibrate if neededAnnually
Advanced Treatment ProductCheck functionalityBi-Annually
*Soil Treatment and DispersalCheck for surfacing/leakingAnnually

Renewal Files

Attach the Flow Readings and Monitoring/Maintenance Report from your Service Provider:

Invoice #60130 (03/29/2024)

Charge Cost Quantity Total
Non-Taxable
added 03/29/2024 9:24 AM

$150.00 x 1 $150.00
Grand Total
Total $150.00
Payment 03/29/2024$150.00
Due$0.00

Approvals

ApprovalSignature
ApplicantDarin Hill - 05/10/2024 4:20 PM - witnessed by Shannon Wiebusch
fff0ce716ea0953e0dbc0ae92b608b01
7e026fb5f006d5d91b034e02eb1ea856
#1 Planning & ZoningShannon Wiebusch - 05/10/2024 4:20 PM
9d5b9ed1d28e81d674710db13194ac94
66c10f5c65aae2c825f6a7cc7b2eb695
Application has been approved. All signatures have been obtained.

Public Notes

Public Notes:
5/10/24 rec'd transfer app and maintenance contract. sw
Attachments:
    Expiration Date: 09/30/2024
    Powered by