OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219, Aitkin, MN 56431
Email: aitkinpz@aitkincountymn.gov
Phone: 218-927-7342
Fax: 218-927-4372
Property Location
| Property Location: |
|
Design Information
| Attach Septic Design & Management Plan: |
Site Plan
| Attach Site Plan: |
|
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
Permit fees are non-refundable after a permit is approved.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
I acknowledge that by submitting this application, the application and its attachments are public information.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
Invoice #59766 (02/29/2024)
| Charge | Cost | Quantity | Total |
|---|---|---|---|
| added 02/29/2024 8:51 AM | $500.00 | x 1 | $500.00 |
| added 02/29/2024 8:51 AM | $600.00 | x 1 | $600.00 |
| Grand Total | |||
| Total | $1,100.00 | ||
| Payment 02/29/2024 | $1,100.00 | ||
| Due | $0.00 | ||
Approvals
| Approval | Signature |
|---|---|
| Applicant | Jordan Cabak - 02/29/2024 9:12 AM 36f19c9d485c8565a2fbe183bc0ba2da f055573b990e1ac6cf37b93d182e2fcf |
| #1 Adminstrative Approval Group | Brock Anderson - 04/02/2024 2:32 PM 0796905fed57d5851fe5b8c43d322c31 9a965cd8e4a3a32bf51ce73031053a83 |
| #2 Inspector Group | Brock Anderson - 04/03/2024 7:52 AM 1d9d8ee76280e83524757dc9a7632500 ed377e4100e7b8ef8ba682e997baac54 |
| #3 Level Three Final Action | Connor Plagge - 04/03/2024 11:59 AM c166bf5a32063fd4279887a5258a1511 1ce808c311c73c909811941d21207e17 |
[
]
[ Search Result Limit:
Part_1_of_2_Dollar_General_malmo_Septic_Design.pdf