Land Use Application Permit # 2024-0084, App. # App-2024-000619, UID # 210022
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

Enter Applicant Contact Information:
Name:
Scott A Stinson
Phone:
(307710 - 6093
Email Address:
slstinson922@gmail.com
Mailing Address:
20730 480th Lane
McGregor MN 55760
Are you the Property Owner? Yes

Property Location

Property Location:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
29-1-46070020730 480th Ln
MCGREGOR, MN 55760
SHAMROCK TWPPINE NEEDLE PARKS:20 T:49 R:23SGDMINNEWAWA - BACK LOTSTINSON, SCOTT & LOU ANNSTINSON, SCOTT & LOU ANN

Project Checklist

1.) Is the property zoned Shoreland? Yes
3.) Are there any wetlands or lowlands on/near the project site? No
4.) Will the structure(s) be used for commercial purposes? No
5.) Is there an existing septic system on the property?
(Outhouse/Privies are also considered septic systems)
Yes
6.) Are you applying to install a new septic system? No

Existing Septic Status

Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? Yes

Project Description

Please describe your proposed project:
Planning to add a 24'x24' addition to the south side of existing attached garage with a 8' lean to on the west side (8'x48')

Planning on adding on to the existing house a 12'x16' sun room with a 12'x6' deck (not roofed) on the west side

Project Type

Item 1 - Structure Type: Residence Addition
Item 1 - Size: 1224 ft2

Shoreland Data

Setback distance from Ordinary High Water Level to the proposed construction? (closest point) 750 Feet
Will the proposed structure(s) be less than 35 foot maximum height? Yes
Are you constructing a walkout basement? No
If you are building an accessory structure, will there will be a loft or second story? No

Natural Landscape Protection Plan

Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? No
How many cubic yards of fill or excavation will be done on the property? 5 CuYd
How close to the property line will any fill be placed or any excavation be done? 75 Feet
What percent slope of the land currently exists on the project site? 1 % slope
Select the erosion control methods that will be used throughout and after your project:
(Check all that apply)
Seeding and/or Mulching

Site Plan

Please include all applicable items from the checklist on your site plan. See example site plan below:
All Existing Structures & Dimensions
All Proposed Structures & Dimensions
Location of Driveways & Access Roads
Location of Well(s)
Location of Septic System(s)
Distance of Proposed Structures to OHWL (closest point)
Distance of Proposed Structures to Septic System(s)
Distance of Proposed Structures to Property Lines
Distance of Proposed Structures to Road Right-of-Way
Distance of Proposed Structures to Alley or Boulevard
Distance of Proposed Structure to Top of Bluff
Attach Site Plan:
Is the site staked and ready for inspection? Yes

Terms

Land Use/Septic Terms & Conditions
  • All appropriate permit fees must be paid in full prior to any necessary review(s) of application.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.

  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • Permit fees are non-refundable after a permit is approved.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."

  • Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

  • I acknowledge that by submitting this application, the application and its attachments are public information.

Invoice #59502 (02/26/2024)

Charge Cost Quantity Total
Non-Taxable
added 02/10/2024 8:02 PM

$400 Flat Fee

$400.00 x 1 $400.00
Grand Total
Total $400.00
Payment 02/26/2024$400.00
Due$0.00

Approvals

ApprovalSignature
ApplicantScott A. Stinson - 02/28/2024 9:55 AM
5a48a3e07a8a6b3025e7eccfbed81a0d
12def5b5949b4ddbbc2c06756f914d05
#1 Adminstrative Approval GroupBrock Anderson - 02/29/2024 3:50 PM
1aa685494eb253a6b9e7f6c37abc9527
e29750dbf46a9d9067ff4eca5afe4bb6
#2 Inspector GroupBrock Anderson - 03/04/2024 7:58 AM
a321409bb757b9672b7234f5d971712a
0fe165d68fa8d20840efe6cb3dfdd5ed
#3 Level Three Final ActionConnor Plagge - 03/04/2024 8:38 AM
39b9834659d17d004f6951e5ee1a59ba
acfcff6ec2417edb00893eb27e31a2ba
Application has been approved. All signatures have been obtained.

Public Notes

Text:
Permit #48475

Approved for 
-1224 sf Residence Addition
 (24x24 Garage Add, 8x48 lean to, 12x16 sun room, 12x6 deck)
File(s):

Admin Checklist

Date application was complete: 02/28/2024
Review started by: Brock Anderson
Zoning District of project location: Shoreland
Required OWHL setback distance:
"Other" OHWL setback distance is:
Project located in the floodplain? No
Base Flood Elevation:
Lowest Floor Elevation:
Is an after construction elevation certificate required?
Property line setbacks appear to be met? Yes
Road R-O-W setbacks appear to be met? Yes
Bluff setbacks appear to be met? N/A
Septic Tank setback appears to be met with/without an engineer's report? Yes
Septic Drainfield setback appears to be met with/without an engineer's report? Yes
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? Yes
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? Redevelopment
Is this After-The-Fact? No

Inspector Checklist

Zoning Inspector: Brock Anderson
Attach necessary inspection forms/photos:
Notes:
Was an onsite conducted for this application? Yes
Powered by