OneGov
Renewal of Permit # OP 25
App. Status: Renewed
Valid: 02/02/2024 - 09/30/2024Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Facility Information
Renewal Type: | 5 Years |
||||||||||||||||||||||||||||
Permittee Contact Information (property owner): |
|
||||||||||||||||||||||||||||
Property Location: |
|
||||||||||||||||||||||||||||
System Type: | Type 4 | ||||||||||||||||||||||||||||
Treatment Level: | A | ||||||||||||||||||||||||||||
Residential/Commercial: | Residential | ||||||||||||||||||||||||||||
System Design Flow (gpd): | 450 gpd | ||||||||||||||||||||||||||||
System Description: | Gravity feed from existing 1350 gallon combination tank into a new 1860 precast concrete septic lift tank. A nibbler Jr is to be placed in the septic end of the tank and will meter and treat liquids into the lift end of the tank. A pump placed in the lift end of the tank is to pump the liquids into a 10' x 15' NCS Polishing sand filter. The treated fluids will gravity from the polishing sand filter into a 110 concrete lift tank into a 20' x 30' Pressure Bed. The bed area will be excavated out to 30' x 50' and replaced with clean sand. |
Service Provider
Attach Signed Maintenance Contract: | |
Select your Service Provider/Inspector/Maintainer: |
|
Service Provider Email: | rittersewer@hotmail.com |
Monitoring Requirements
Monitoring Requirements: |
|
Maintenance Requirements
Maintenance Requirements: |
|
Renewal Files
Attach the Flow Readings and Monitoring/Maintenance Report from your Service Provider: |
Terms
Aitkin County Environmental Services authorizes the Permittee to operate a wastewater treatment and dispersal system at the address named above in accordance with the requirements of this operating permit, attached Management Plan and contract with the Service Provider/Inspector.
This permit is effective on the issuance date identified above. This permit and the authorization to treat and disperse wastewater shall expire on the expiration date identified above. The Permittee is not authorized to discharge after the above date of expiration. The Permittee shall submit monitoring information on forms as required by Aitkin County Environmental Services no later than thirty (30) days prior to the above date of expiration for operating permit renewal. This permit is not transferable.
The owner is required to obtain the services of a Minnesota Pollution Control Agency (MPCA) licensed and trained: 1) Service Provider or Inspector to provide ongoing system operation, maintenance, and monitoring and 2) Maintainer to pump the system's sewage tanks and components. The owner is responsible to provide the name of the Service Provider or Inspector business prior to the issuance of this operating permit. The owner has secured the services of [Name of Service Provider or Inspector] as the Service Provider or Inspector for this system. The Service Provider or Inspector is hereby authorized to provide the required monitoring data and routine maintenance service records to Aitkin County Environmental Services.
[For systems that generate high strength wastewater, the following items should be added to the operating permit: 'If there is a change of use within the facility (i.e., change in menu, increase in food capacity, change in water use fixtures, etc.), the permittee is required to notify Aitkin County Environmental Services and the Service Provider before any changes occurs. Changes to the facility that could potentially impact performance of the wastewater treatment and dispersal system shall not take place until appropriate evaluation has been completed.']
I hereby certify with my signature as the Permittee that I understand the provisions of the wastewater treatment and dispersal system operating permit including maintenance and monitoring requirements. I agree to indemnify and hold Aitkin County harmless from all loss, damages, costs and charges that may be incurred by the use of this system. If I fail to comply with the provisions of this operation permit, I understand that penalties may be issued. If I sell this property during the life of the permit, I will inform the new owner(s) of the permit requirements and the need to renew the operating permit.
In the event the wastewater treatment system does not meet required performance requirements as contained in this operating permit, the owner shall notify Aitkin County Environmental Services within thirty (30) days of receiving non-compliant information. The owner is responsible to obtain the services of a Minnesota Pollution Control Agency (MPCA) licensed Service Provider or other qualified practitioner to complete the required corrective measures
Any sampling and laboratory testing procedures shall be performed in accordance with the proprietary treatment product's protocol, Standard Methods, and at a Minnesota Department of Health approved laboratory. Results shall be submitted to the permitting authority at: Aitkin County Environmental Services, 307 2nd St NW, Room 219, Aitkin, MN 56431 no later than the expiration date listed.
Invoice #59384 (02/02/2024)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 02/02/2024 2:04 PM | $150.00 | x 1 | $150.00 |
Grand Total | |||
Total | $150.00 | ||
Payment 02/02/2024 | $150.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Patrick O'Connor - 02/02/2024 2:05 PM - witnessed by Shannon Wiebusch 93c953630af93d71979882bc9dbaa36d 625c0668f41d4a413e328c0f4a5e5d84 |
#1 Planning & Zoning | Shannon Wiebusch - 02/02/2024 2:05 PM 6f546dbabfae050dc3d8d9204ed540cf c5ab51cba11a5b2bc99641f46e37684e |
Public Notes
Public Notes: | |
Attachments: | |
Expiration Date: | 09/30/2024 |