SSTS Operating Permit Permit # OP 878, App. # App-2024-000224, UID # 209792
App. Status: Approved
Valid: 10/25/2023 - 09/30/2026
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Facility Information

Permit Type:
Initial Application
Permittee Contact Information (property owner):
Name:
Nancy Thompson
Phone:
(651747 - 7457
Email Address:
bohnenfarm@yahoo.com
Mailing Address:
9130 182nd Street N
Forest Lake MN 55025
Property Location:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
36-1-07820037707 STATE HWY 18
AITKIN, MN 56431
WEALTHWOOD TWPELYS LAKE VIEW LOTSS:21 T:45 R:26GDMILLE LACSTHOMPSON, NANCY & BOHNEN, TODDTHOMPSON, NANCY & BOHNEN, TODD
System Type: Type 3
Treatment Level: A
Residential/Commercial: Residential
System Design Flow (gpd): 450
System Description:
TANK TO BOX MOUND WITH 14?X42? ROCKBED

Service Provider

Attach Signed Maintenance Contract:
Select your Service Provider/Inspector/Maintainer:
NameLicense #ExpirationPhoneAddressInspectorInstallerMaintainerService Provider
BT Services LLCL208801/05/2025218-831-6430 PO Box 62, Brainerd MN 56401YesYesNoNo
Service Provider Email: btservices56401@gmail.com

Monitoring Requirements

Monitoring Requirements:
ParameterEffluent LimitsFrequencyLocation
*Design Flow (gpd)450 GPDMonthlyEvent Counter
*Ponding/Surfacing in Soil TreatmentNone AllowedAnnuallyDrainfield
Monitoring Requirements Comments:
Owner will record water use at the event counter once a month or when present. Owner will send monthly readings
report to Aitkin Co. every 6 months.

Maintenance Requirements

Maintenance Requirements:
System ComponentMaintenanceFrequency
*Septic Tank/Trash TankCheck components/ buildup / leakingAnnually
*Pump Tank and ControlsCheck components, wiring & settingsAnnually
Effluent ScreenCheck and cleanAnnually
*Soil Treatment and DispersalInspect for signs of failure/check effluent levelsAnnually
*Soil Treatment and DispersalCheck control unitAnnually

Terms

Monitoring Protocol
  • Aitkin County Environmental Services authorizes the Permittee to operate a wastewater treatment and dispersal system at the address named above in accordance with the requirements of this operating permit, attached Management Plan and contract with the Service Provider/Inspector.

    This permit is effective on the issuance date identified above. This permit and the authorization to treat and disperse wastewater shall expire on the expiration date identified above. The Permittee is not authorized to discharge after the above date of expiration. The Permittee shall submit monitoring information on forms as required by Aitkin County Environmental Services no later than thirty (30) days prior to the above date of expiration for operating permit renewal. This permit is not transferable.

    The owner is required to obtain the services of a Minnesota Pollution Control Agency (MPCA) licensed and trained: 1) Service Provider or Inspector to provide ongoing system operation, maintenance, and monitoring and 2) Maintainer to pump the system's sewage tanks and components. The owner is responsible to provide the name of the Service Provider or Inspector business prior to the issuance of this operating permit. The owner has secured the services of [Name of Service Provider or Inspector] as the Service Provider or Inspector for this system. The Service Provider or Inspector is hereby authorized to provide the required monitoring data and routine maintenance service records to Aitkin County Environmental Services.

    [For systems that generate high strength wastewater, the following items should be added to the operating permit: 'If there is a change of use within the facility (i.e., change in menu, increase in food capacity, change in water use fixtures, etc.), the permittee is required to notify Aitkin County Environmental Services and the Service Provider before any changes occurs. Changes to the facility that could potentially impact performance of the wastewater treatment and dispersal system shall not take place until appropriate evaluation has been completed.']

    I hereby certify with my signature as the Permittee that I understand the provisions of the wastewater treatment and dispersal system operating permit including maintenance and monitoring requirements. I agree to indemnify and hold Aitkin County harmless from all loss, damages, costs and charges that may be incurred by the use of this system. If I fail to comply with the provisions of this operation permit, I understand that penalties may be issued. If I sell this property during the life of the permit, I will inform the new owner(s) of the permit requirements and the need to renew the operating permit.

Contingency Plan
  • In the event the wastewater treatment system does not meet required performance requirements as contained in this operating permit, the owner shall notify Aitkin County Environmental Services within thirty (30) days of receiving non-compliant information. The owner is responsible to obtain the services of a Minnesota Pollution Control Agency (MPCA) licensed Service Provider or other qualified practitioner to complete the required corrective measures

Authorization
  • Any sampling and laboratory testing procedures shall be performed in accordance with the proprietary treatment product's protocol, Standard Methods, and at a Minnesota Department of Health approved laboratory. Results shall be submitted to the permitting authority at: Aitkin County Environmental Services, 307 2nd St NW, Room 219, Aitkin, MN 56431 no later than the expiration date listed.

Invoice #59328 (01/26/2024)

Charge Cost Quantity Total
Non-Taxable
added 01/26/2024 1:27 PM

$150.00 x 1 $150.00
Grand Total
Total $150.00
Payment 01/26/2024$150.00
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantNancy Thompson - 01/26/2024 1:29 PM - witnessed by Connor Plagge
1944035afbf65ca3d40c67be909d341e
1b28e40bcdbd9d70632ff23d14aba6a9
 
#1 Planning & ZoningConnor Plagge - 01/26/2024 1:30 PM
77c387a380c5d11370fd81b178479c32
c21330d3965defbb3d6b1ee30b5ec97c
 
Application has been approved. All signatures have been obtained.
Public Notes:
Attachments:
    Expiration Date: 09/30/2026
    Internal Notes:
    Attachments:
      Powered by