OneGov
App. Status: DeniedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
If we have questions on the application who should we contact? |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Project Location Search
Property: |
|
Driving directions to the property from Aitkin.: | HWY 18 TO CTY 38 TO 111TH TO 117 |
Project Description
Please describe your proposed project: | The shoreline is eroding we would like to put in some two foot boulders along it and put some sand behind them. Right in front of our buffer zone. |
Site Drawing(s)
Land Alteration Site Sketch Checklist: | Location and size of alteration. |
Attach a copy of your Site Sketch(s): |
|
Vegetation Removal
Number of Trees to be removed: | 0 |
Number of Shrubs to be removed: | 0 |
Type of Clearing Used?
(Check all that apply) |
Hand Clearing |
Please explain: | want to have 2 foot boulders set at water line to curb erosion. |
Excavation Details
Nature of Material to be used?
(Check all that apply) |
Sand Rock |
Total Amount of Excavation and/or Fill proposed? (cubic yards) | 1 CuYd |
Total Area to be Graded and/or Filled? (L x W) | 80 ft2 |
Attach a photo of the area to be altered (as it exists today).: |
|
Erosion Control Practices
Indicate the following erosion control measures that will be used throughout and after your project? (Check all that apply) |
Other (explain below) |
If other, please explain: | should be none |
Describe how you intend to implement this plan and your finished vegetation plan.: |
existing vegetation. adding rocks to stop erosion |
Other Information
Other: | 9/22/16 Mark Andersen emailed in attached photo from marka@andersencabinet.com |
Other Attachments (optional): |
|
Terms
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
If you see sections marked in red on the left hand column, you must re-visit those sections and make corrections.
To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #1787 (09/14/2016)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 09/14/2016 11:46 AM $150 Flat Fee |
$150.00 | x 1 | $150.00 |
Grand Total | |||
Total | $150.00 | ||
Payment 09/14/2016 | $150.00 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | MARK E. ANDERSEN - 09/14/2016 11:47 AM c8a403d118a3ac69822df28cd6555f41 4b3768b13a03e9fdd7553ceda841fa19 | |
#1 Adminstrative Approval Group | Kalea Suihkonen - 09/19/2016 3:25 PM 4f5da8ef99e063bd7f2ae0d148bfe7ae 16e957786348920a9173474592e519ee |
Text: | 10/5/2016 refund of $50 given via Visa Credit Card ($100 onsite inspection fee is non-refundable). No fill (sand, rock, block, soil, or gravel to name some examples) can be placed in a wetland that has a contiguous connection to a lake. The proposal of 2-foot rock being placed in the water would not constitute rip rap. Other options on this site include native vegetation regrowth without mowing, to encourage deeper root systems. Coir logs or willow wattle will also provide erosion control without impacting the wetland. |
File(s): |
Text: | Denied land alteration request. Sheila Anderson was very mad that she couldn't construct a 2' retaining wall in the lake with sand fill behind it. They have a patio constructed within the last 3 years, which is a water-oriented accessory structure. They already have a large boathouse with a deck on top. She was so unpleasant on the phone that I didn't raise the issue that they have a patio that needs a variance. |
File(s): |
Date application was complete: | |
This review has been started by: | |
Zoning District of project location: | Shoreland |
Zoning Inspector: | Becky Sovde |
Attach necessary inspection forms: |
|
Is the project in the Shore Impact Zone? | |
Was an onsite conducted for this application? | |
Is this an After-The-Fact application? | |
Project located in the floodplain? | |
Base Flood Elevation: |