Land Alteration Permit # 2023-1136, App. # App-2023-001252, UID # 209290
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

If we have questions on the application who should we contact?
Name:
Dennis Jay Sutliff
Phone:
(612859 - 0240
Email Address:
dennis.sutliff@gmail.com
Mailing Address:
625 Kenwood Pkwy
Minneapolis MN 55403
Are you the Property Owner? Yes

Project Location Search

Property:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
29-1-46220020571 480th Ln
MCGREGOR, MN 55760
SHAMROCK TWPPINEHURSTS:20 T:49 R:23GDMINNEWAWA LAKESUTLIFF, DENNIS TTE & SUTLIFF,DAVIDSUTLIFF, DENNIS TTE & SUTLIFF,DAVID
Driving directions to the property from Aitkin.:
From Hwy 65, turn east on CR 14.  Go .7 mi to 480th Ln.  Turn right on 480th Ln.  
Go .2 mi. to 20571.

Project Description

Please describe your proposed project:
Shore land restoration to include installation of rip rap
Will you be removing vegetation during this project? No

Site Drawing(s)

Land Alteration Site Sketch Checklist:
Location and size of all existing structures.
Location and size of all proposed structures.
Location of all driveways and/or access roads.
Location and size of alteration.
Location of erosion control measures.
Distance of alteration to OHWL (closest point)
Distance of alteration to property lines.
Distance of alteration to existing structures.
Cross-section of cut and/or fill locations.
Attach a copy of your Site Sketch(s):

Excavation Details

Nature of Material to be used?
(Check all that apply)
Gravel
Rock
Other (explain below)
If other, please explain:
Vegetation
Total Amount of Excavation and/or Fill proposed? (cubic yards) 58 CuYd
Total Area to be Graded and/or Filled? (L x W) 738 ft2
Attach a photo of the area to be altered (as it exists today).:

Erosion Control Practices

Indicate the following erosion control measures that
will be used throughout and after your project?
(Check all that apply)
Other (explain below)
If other, please explain:
MNDOT catagory 30 erosion control blanket
Describe how you intend to implement this plan
and your finished vegetation plan.:
A licensed contractor will accomplish the work in accordance with plans prepared by Aitkin County?s Civil Engineering consultant, Trchnical ServicecArea III,

Other Information

Other:
Access to the lakeshore will likely be across private property and will likely required some  tree trimming and/or removal.

Terms

General Terms Zoning Permits
  • All appropriate permit fees must be paid in full prior to any necessary review(s) of application.

  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

  • To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.

  • I acknowledge that by submitting this application, the application and its attachments are public information.

Land Use/Septic General Terms
  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

Invoice #58965 (10/28/2023)

Charge Cost Quantity Total
Non-Taxable
added 10/27/2023 3:14 PM

$200 Flat Fee

$200.00 x 1 $200.00
Grand Total
Total $200.00
Payment 10/28/2023$200.00
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantDennis J. Sutliff - 10/28/2023 11:26 AM
293089469903db63f7a4ee8ec8bdf96f
3220b5f2523aae6488ea10f50631cf76
 
#1 Adminstrative Approval GroupHenry Egland - 10/30/2023 8:53 AM
8ac33db6ed4d37e0df835bf8451a8a67
a94afa846509e1a4f2d2e5ea0f51fae3
 
#2 Inspector GroupHenry Egland - 11/14/2023 9:29 AM
08b3dbb76789d64dbe84ee9f33537aac
e02437b4fe818a9779844b111d55b529
 
#3 Final ActionConnor Plagge - 11/14/2023 10:51 AM
d392646b2d62da98a0fec9efa8050e12
91a8fdee05d3384beb8acca999a94924
 
Application has been approved. All signatures have been obtained.
Text:
Permit #48363

Approved for land alteration: Excavation, Rip-rap, and Restoration Per Engineered Plan.
File(s):
Text:
File(s):
    Date application was complete: 10/30/2023
    This review has been started by: Henry Egland
    Zoning District of project location: Shoreland
    Zoning Inspector: Henry Egland
    Attach necessary inspection forms:
      Is the project in the Shore Impact Zone? Yes
      Was an onsite conducted for this application? No
      Is this an After-The-Fact application? No
      Project located in the floodplain? No
      Base Flood Elevation:
      Powered by