OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
If we have questions on the application who should we contact? |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Project Location Search
Property: |
|
Driving directions to the property from Aitkin.: | N 169 to E 210 to N CR Rd 5. Turn right on 438th Lane towards Long Lake Conservation Camp. At camp turn left to stay in 438, follow 438th Lane to property. Property has no cabin and is next to the green cabin. |
Project Description
Please describe your proposed project: | Addition of riprap on lakeshore to prevent continued erosion of hillside. |
Will you be removing vegetation during this project? | No |
Site Drawing(s)
Land Alteration Site Sketch Checklist: | Location of erosion control measures. |
Attach a copy of your Site Sketch(s): |
|
Excavation Details
Nature of Material to be used?
(Check all that apply) |
Boulders |
Total Amount of Excavation and/or Fill proposed? (cubic yards) | 0 CuYd |
Total Area to be Graded and/or Filled? (L x W) | 0 ft2 |
Attach a photo of the area to be altered (as it exists today).: |
|
Erosion Control Practices
Indicate the following erosion control measures that will be used throughout and after your project? (Check all that apply) |
Other (explain below) |
If other, please explain: | Landscape fabric |
Describe how you intend to implement this plan and your finished vegetation plan.: |
Placement of landscape fabric along shoreline and then boulders placed on top. |
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.
I acknowledge that by submitting this application, the application and its attachments are public information.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #58555 (10/02/2023)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 09/01/2023 2:45 PM $200 Flat Fee |
$200.00 | x 1 | $200.00 |
Grand Total | |||
Total | $200.00 | ||
Payment 10/02/2023 | $200.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Jason Hagemeyer - 10/02/2023 8:03 PM 727c38593a5b0b2e274a89b5f8eadb1d 63447b40e185cc15d7bc0cfd9eb4ad4f |
#1 Adminstrative Approval Group | Henry Egland - 10/11/2023 1:21 PM cb940a99ea320396337085068e3090f7 8a2a71487c734a95cab635bba7fd74f6 |
#2 Inspector Group | Henry Egland - 10/11/2023 2:49 PM 69e60f839b24105ff7e64e54968d08e7 c7dec1c6564930ec57beb02b708ea578 |
#3 Final Action | Connor Plagge - 10/17/2023 8:24 AM 6b772f54010052e05768d3686be8ddb6 ab9b57090c9dd6a46b8cdbe69c94984c |
Public Notes
Text: | Permit #48292 Approved for land alteration: Rip-rap Condition: Establish and maintain native vegetation buffer along top of rip-rap, silt fence to be installed until hillside has revegetated. |
File(s): |
|
Internal Notes
Text: | |
File(s): |