Land Alteration Permit # 2023-0835, App. # App-2023-000965, UID # 208827
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

If we have questions on the application who should we contact?
Name:
Mark Misgen
Phone:
(612269 - 5642
Email Address:
smisgen@hotmail.com
Mailing Address:
44332 334th Ln
Aitkin MN 56431
Are you the Property Owner? Yes

Project Location Search

Property:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
07-0-010503FARM ISLAND TWPS:5 T:46 R:27NETAYLOR LAKEMISGEN, MARK & SARA DEGEN-MISGEN, MARK & SARA DEGEN-
Driving directions to the property from Aitkin.:
Go west on 210, turn south on pioneer ave. go about 3 miles turn west on 334th Ln, it is 2nd driveway on the left.

Project Description

Please describe your proposed project:
restore an existing overgrown road/driveway to gain access to our Taylor Lake shoreline
Will you be removing vegetation during this project? Yes

Site Drawing(s)

Land Alteration Site Sketch Checklist:
Location and size of all existing structures.
Attach a copy of your Site Sketch(s):

Vegetation Removal

Number of Trees to be removed: 20
Number of Shrubs to be removed: 0
Type of Clearing Used?
(Check all that apply)
Mechanical Clearing
Hand Clearing
Please explain:
A chainsaw will be used to remove trees, and a skid loader will be used to repair and improve the driveway and road.

Excavation Details

Nature of Material to be used?
(Check all that apply)
Other (explain below)
If other, please explain:
existing materials from the trees and road, nothing hauled in.
Total Amount of Excavation and/or Fill proposed? (cubic yards) 50 CuYd
Total Area to be Graded and/or Filled? (L x W) 2000 ft2
Attach a photo of the area to be altered (as it exists today).:

Erosion Control Practices

Indicate the following erosion control measures that
will be used throughout and after your project?
(Check all that apply)
Sediment Control Logs
Seeding and/or Mulching
Describe how you intend to implement this plan
and your finished vegetation plan.:
Upkeep the road/driveway by putting logs along the edge to stop erosion.

Terms

General Terms Zoning Permits
  • All appropriate permit fees must be paid in full prior to any necessary review(s) of application.

  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

  • To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.

  • I acknowledge that by submitting this application, the application and its attachments are public information.

Land Use/Septic General Terms
  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

Invoice #58518 (08/26/2023)

Charge Cost Quantity Total
Non-Taxable
added 08/26/2023 3:55 PM

$200 Flat Fee

$200.00 x 1 $200.00
Grand Total
Total $200.00
Payment 08/28/2023$200.00
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantMark A. Misgen - 08/26/2023 3:56 PM
00ba17a737b1479b7db79036bbdb902c
1cb7f72cfb326a3f113aa6493b31e4e9
 
#1 Adminstrative Approval GroupHenry Egland - 08/28/2023 10:25 AM
4cd2387b23aca5322929f40542f9c574
72f3c26a99d3edb58acbabe90b8c64ad
 
#2 Inspector GroupHenry Egland - 08/28/2023 11:59 AM
fa41a47309b7604a7ca8f06a6f22e447
075fd96a8896bfe5898387b3ff753578
 
#3 Final ActionConnor Plagge - 08/28/2023 1:21 PM
565cf90b0358c38768839f056e39cc7d
4a2a4c1d0368fa11a29552e35f30b7c3
 
Application has been approved. All signatures have been obtained.
Text:
Permit #48150

Approved for ATF land alteration.

Condition: Site must be brought into compliance by December 31, 2023.
File(s):
Text:
File(s):
    Date application was complete: 08/28/2023
    This review has been started by: Henry Egland
    Zoning District of project location: Shoreland
    Zoning Inspector: Henry Egland
    Attach necessary inspection forms:
      Is the project in the Shore Impact Zone? Yes
      Was an onsite conducted for this application? Yes
      Is this an After-The-Fact application? Yes
      Project located in the floodplain? No
      Base Flood Elevation:
      Powered by