If we have questions on the application who should we contact? |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Project Location Search
Property: |
|
Driving directions to the property from Aitkin.: | Hwy 47 South to County Rd 4 to 335th LN. |
Project Description
Please describe your proposed project: | Install French Drain on Shoreline using 1 1/2" rock to filter water run off. then protect shoreline from erosion with rip rap rock. Replace rip rap at ramp that was damaged by spring ice sheet ramming against shoreline. Using 1 load of large rock with landscape fabric. French drain- L 12', W 2', D 3'. Planting tree's. approximate material's are as follows; 3 yards of 1 1/2" river rock. 4 yards of large rock. 3 yards of black dirt. landscape fabric. |
Will you be removing vegetation during this project? | No |
Site Drawing(s)
Land Alteration Site Sketch Checklist: | Location and size of all existing structures. Location and size of all proposed structures. Location of all driveways and/or access roads. Location of wetlands. Location and size of alteration. Location of erosion control measures. Location of fill disposal, if done on site. Distance of alteration to OHWL (closest point) Distance of alteration to property lines. Distance of alteration to existing structures. Distance of alteration to proposed structures. Cross-section of cut and/or fill locations. |
Attach a copy of your Site Sketch(s): |
|
Excavation Details
Nature of Material to be used?
(Check all that apply) |
Black Dirt Rock |
Total Amount of Excavation and/or Fill proposed? (cubic yards) | 10 CuYd |
Total Area to be Graded and/or Filled? (L x W) | 20 ft2 |
Attach a photo of the area to be altered (as it exists today).: |
|
Erosion Control Practices
Indicate the following erosion control measures that will be used throughout and after your project? (Check all that apply) |
Seeding and/or Mulching Tree Planting |
Describe how you intend to implement this plan and your finished vegetation plan.: |
seeded and planting trees to strength shoreline bank. |
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.
I acknowledge that by submitting this application, the application and its attachments are public information.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #58352 (08/15/2023)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 08/15/2023 1:15 PM $200 Flat Fee |
$200.00 | x 1 | $200.00 |
Grand Total | |||
Total | $200.00 | ||
Payment 08/15/2023 | $200.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Timothy Patterson - 08/15/2023 1:18 PM ed90c177d0b7eea322e00874b3833f72 84b1bf4548207f0f8ecbf0e97d3cb957 |
#1 Adminstrative Approval Group | Henry Egland - 08/15/2023 1:27 PM a11b05ee88d282982946655bf611498a 1ccf11dbd76284eb3f831f8fc1763078 |
#2 Inspector Group | Henry Egland - 08/15/2023 1:34 PM bd1f4af95b6a6606c6697cd467626359 10e8ff799b2803014839da3e4bd04dd2 |
#3 Final Action | Connor Plagge - 08/16/2023 3:28 PM 1ca92112d2c19bc89946ca85200f39d5 2c3721b3519a6b7c1b72d2269d1938b4 |
Public Notes
Text: | Permit #48111 Approved for land alteration |
File(s): |
|
Internal Notes
Text: | |
File(s): |