OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Enter Applicant Contact Information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Property Location
Property Location: |
|
Enter directions to the property (if no property address assigned): | Go East on Hwy 210 to Mcgregor. North on Hwy 65 to Hwy 6 (Willey?s). East on Hwy 6 to 188th Ave. Turn left on 188th and follow to 19086 484th St. Sign at road says ? Johnson Cabin?. |
Project Checklist
1.) Is the property zoned Shoreland? | Yes |
3.) Are there any wetlands or lowlands on/near the project site? | No |
4.) Will the structure(s) be used for commercial purposes? | No |
5.) Is there an existing septic system on the property? (Outhouse/Privies are also considered septic systems) |
Yes |
6.) Are you applying to install a new septic system? | No |
Existing Septic Status
Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? | Yes |
Project Description
Please describe your proposed project: | Proposing to build a 36 x 48 storage building with 12 foot walls. |
Project Type
Item 1 - Structure Type: | Accessory Building |
Item 1 - Size: | 1728 ft2 |
Shoreland Data
Setback distance from Ordinary High Water Level to the proposed construction? (closest point) | 390 Feet |
Will the proposed structure(s) be less than 35 foot maximum height? | Yes |
Are you constructing a walkout basement? | No |
If you are building an accessory structure, will there will be a loft or second story? | No |
Natural Landscape Protection Plan
Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? | No |
How many cubic yards of fill or excavation will be done on the property? | 100 CuYd |
How close to the property line will any fill be placed or any excavation be done? | 34 Feet |
What percent slope of the land currently exists on the project site? | 0 % slope |
Select the erosion control methods that will be used throughout and after your project: (Check all that apply) |
Seeding and/or Mulching |
Site Plan
Please include all applicable items from the checklist on your site plan. See example site plan below: | All Existing Structures & Dimensions All Proposed Structures & Dimensions Location of Driveways & Access Roads Location of Well(s) Location of Septic System(s) Distance of Proposed Structures to OHWL (closest point) Distance of Proposed Structures to Septic System(s) Distance of Proposed Structures to Property Lines Distance of Proposed Structures to Road Right-of-Way Distance of Proposed Structures to Alley or Boulevard Distance of Proposed Structure to Top of Bluff |
Attach Site Plan: |
|
Is the site staked and ready for inspection? | Yes |
Additional Info
Additional info: (optional) |
The building will be a Merickel Metal Storage shed. I just received the septic certificate of compliance and it has been sent to the county. |
Attachments: (e.g. blueprints, floor plan, compliance inspection, or other information) |
|
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Permit fees are non-refundable after a permit has been approved.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
I acknowledge that by submitting this application, the application and its attachments are public information.
Invoice #58049 (07/12/2023)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 07/11/2023 7:29 PM $300 Flat Fee |
$300.00 | x 1 | $300.00 |
Grand Total | |||
Total | $300.00 | ||
Payment 07/17/2023 | $300.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Tim D. Johnson - 07/27/2023 4:10 PM fda7f469e6ac03d1cfed4a73618b5653 66fde5eee620f6dec6949587f50ce2c8 |
#1 Adminstrative Approval Group | Henry Egland - 07/28/2023 8:08 AM c1f0cd46e1a404247890982803cddbe9 ebbf4be74460a975b32ccd3b50fbdd12 |
#2 Inspector Group | Henry Egland - 07/28/2023 8:21 AM 3a35da47b7b73b5d08979397a531daac 802bd8384240ba2d92067788d5667315 |
#3 Level Three Final Action | Connor Plagge - 07/28/2023 10:07 AM b6863a4f556b9c083669fd529b3451be 39d5c0f7aacb61a08e845a844bfa9c75 |
Public Notes
Text: | Permit #48035 Approved for 1728 sq/ft accessory structure. Not for commercial use. Not for human habitation. |
File(s): |
|
Admin Checklist
Date application was complete: | 07/27/2023 |
Review started by: | Henry Egland |
Zoning District of project location: | Shoreland |
Required OWHL setback distance: | |
"Other" OHWL setback distance is: | |
Project located in the floodplain? | No |
Base Flood Elevation: | |
Lowest Floor Elevation: | |
Is an after construction elevation certificate required? | |
Property line setbacks appear to be met? | Yes |
Road R-O-W setbacks appear to be met? | Yes |
Bluff setbacks appear to be met? | N/A |
Septic Tank setback appears to be met with/without an engineer's report? | Yes |
Septic Drainfield setback appears to be met with/without an engineer's report? | Yes |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? | Redevelopment |
Is this After-The-Fact? | No |
Inspector Checklist
Zoning Inspector: | Henry Egland |
Attach necessary inspection forms/photos: | |
Notes: | All setbacks were met |
Was an onsite conducted for this application? | Yes |