If we have questions on the application who should we contact? |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | No |
Property Owner Contact
Property Owner Phone Number: |
|
||||
Property Owner Email Address: | dgkirkpa@aol.com |
Project Location Search
Property: |
|
Driving directions to the property from Aitkin.: | From Hwy 65 and 210 in Mcgregor go north on State Hwy 65 to 531st Ln go right one block to the stop sign go right on 223rd Pl job site is between 52844 223rd Pl and 52819 223rd Pl on Right |
Project Description
Please describe your proposed project: | The location of this project is south of the Big Sandy Lake Dam between 52844 223rd Pl and 52819 223rd Pl on the Right. This is the north property line for Parcel ID # 18-1-0683501 and is used for a utility Easement and my boat ramp that is adjoined on the West shoreline of Big Sandy Lake that is 33ft wide and runs 42ft west to meet 223rd PL, which runs South and North. From the West side of 223rd PL continues 44ft west and 25ft wide used for parking; at that point, the Easement continues to go up a steep incline and continues West along the north property line. When coming into the 44 x 25ft parking area off 223rd PL with my pontoon, there is not enough distance to be straight in line with my boat ramp going to the lake. I figured I needed a total of 69ft from the west side of 223rd PL to line up straight with the boat ramp. I talked to 2 council members from Libby Township, explained what I wanted to do, and asked each of them if I needed a permit to do what I wanted to do. One said no, the other said I should not need a permit, and nobody else got one. So I marked off an additional 23ft from the 44ft going West into the hillside. With only 25ft for the width, I decided to use a 25,000lbs load-rated steel upright instead of a retaining block which I would lose a little over 2ft from the 25ft width; using the steel uprights, I only lost 11" from the 25 ft width. The steel uprights will be placed along the North, West, and South walls. Each upright post will be below grade 3ft, and a 3/8 rebar 6ft long will be placed inside each upright post and driven down three more feet past the upright base. Rock and fill are added along the base of the walls. Steel sheeting is placed inside the steel uprights from top to bottom and bolted to the posts. As promised, Mickman Bros. suggested adding 3/8 rebar (Anchors) that are ten feet long with hooks welded at the ends and driven into the side wall every 4 feet apart and connected to the steel uprights, and then rock and fill that was removed from the hillside will be used for backfilling the side walls. I have attached a copy of the area of the hill that needs to be removed with the measurements. |
Will you be removing vegetation during this project? | Yes |
Site Drawing(s)
Land Alteration Site Sketch Checklist: | Location and size of all existing structures. Location and size of all proposed structures. Location of all driveways and/or access roads. Location of wetlands. Location and size of alteration. Location of erosion control measures. Location of fill disposal, if done on site. Distance of alteration to OHWL (closest point) Distance of alteration to property lines. Distance of alteration to existing structures. |
Attach a copy of your Site Sketch(s): |
|
Vegetation Removal
Number of Trees to be removed: | 0 |
Number of Shrubs to be removed: | 0 |
Type of Clearing Used?
(Check all that apply) |
Mechanical Clearing Hand Clearing |
Please explain: | This 25ft wide is a Utility easement cleared by Lake country power. I will be removing about 98 yds using my skid steer and stockpiling within the parking area that is within the site plan area and then using it as needed to backfill until the project is done and any extra will be left in the parking area to try and match the grade to the south. |
Excavation Details
Nature of Material to be used?
(Check all that apply) |
Sand Gravel Rock |
Total Amount of Excavation and/or Fill proposed? (cubic yards) | 30 CuYd |
Total Area to be Graded and/or Filled? (L x W) | 1725 ft2 |
Attach a photo of the area to be altered (as it exists today).: |
|
Erosion Control Practices
Indicate the following erosion control measures that will be used throughout and after your project? (Check all that apply) |
Silt Fence Seeding and/or Mulching Other (explain below) |
If other, please explain: | When completed Silt fencing will be removed and 8"x*8" treated will be along both property lines meeting with 223rd PL. Heavy Duty Astro Turf (Green) will be placed between the two property lines covering the complete parking area. |
Describe how you intend to implement this plan and your finished vegetation plan.: |
I, Tim Richter intend to plant as many trees, shrubs, and Grass as possible without affecting the purpose of this project. I will be using this area on a weekly schedule and will do whatever is needed to keep it looking nice and erosion and drainage under control for as long as I need lake access. |
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.
I acknowledge that by submitting this application, the application and its attachments are public information.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #57874 (07/06/2023)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 06/29/2023 5:46 PM $200 Flat Fee |
$200.00 | x 5 | $1,000.00 |
Grand Total | |||
Total | $1,000.00 | ||
Payment 07/19/2023 | $200.00 | ||
Payment 08/11/2023 | $800.00 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Tim Richter - 08/11/2023 10:08 AM - witnessed by Connor Plagge 7da3d3f289695ccc630bea5649a1a505 7f687c30dd81b03084908c6196a3be15 | |
#1 Adminstrative Approval Group | Connor Plagge - 08/11/2023 10:44 AM 5e985f984b87036743b1bfe485750025 7917275c3430d9b8cd39507041ae237c | |
#2 Inspector Group | Connor Plagge - 08/11/2023 3:15 PM 92e75fba42ae1146118764c05bcadd01 75a6984bbf4b08298d45af53130af20d | |
#3 Final Action | Connor Plagge - 08/11/2023 3:24 PM d61f214587877c80345793aa2f481da6 1ccc222174d71cb917594763c42596d4 |
Text: | Permit #48100 Approved for After-the-Fact land alteration - Slope Restoration and Terracing for Slope Stabilization. |
File(s): |
|
Text: | |
File(s): |
Date application was complete: | 08/11/2023 |
This review has been started by: | Connor Plagge |
Zoning District of project location: | Shoreland |
Zoning Inspector: | Connor Plagge |
Attach necessary inspection forms: |
|
Is the project in the Shore Impact Zone? | No |
Was an onsite conducted for this application? | Yes |
Is this an After-The-Fact application? | Yes |
Project located in the floodplain? | No |
Base Flood Elevation: |