OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Applicant contact information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Property Location
Property Location: |
|
Enter directions to the property (if no address assigned): | GPS |
Septic Type
Select the system you are applying for: | Residential Other/Performance (Type 3) Residential Operating Permit (Type 3, 4, 5) |
Design Information
Attach Septic Design & Management Plan: | |
Designer Name: |
|
Operating Permit
Attach the Operating Permit Application & Maintenance Contract: |
Installer
Self Install or Licensed Install?: | Licensed Septic Installer |
Licensed Installer Name: |
|
Terms
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
Property lines, septic sites, wells, and road right-of-ways must be clearly defined with flags, ribbon, or lathe prior to onsite inspection by Aitkin County.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
I acknowledge that by submitting this application, the application and its attachments are public information.
Invoice #57738 (06/09/2023)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 06/09/2023 3:00 PM | $150.00 | x 1 | $150.00 |
added 06/09/2023 3:00 PM | $400.00 | x 1 | $400.00 |
Grand Total | |||
Total | $550.00 | ||
Payment 06/09/2023 | $350.00 | ||
Payment 06/09/2023 | $200.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Gary Seiger - 06/09/2023 3:28 PM - witnessed by Henry Egland 660f278406effe1a6cb0403edaaf691b 5505ddd7f548ecda974ccd3265b5f3e7 |
#1 Adminstrative Approval Group | Shannon Wiebusch - 06/28/2023 12:40 PM 74715bf5278f29bad25d21f00d972866 4e0763c082a3d2d9275d301664c83f9a |
#3 Final Approval | Connor Plagge - 07/03/2023 11:03 AM 7ff011dd980269b70a8091ff7543a970 eab97ed63556a6eea2730f70baa66847 |
#2 Inspector Group | Shannon Wiebusch - 06/29/2023 1:05 PM 66139e705887535b15d81c49fa4edc7d 435d52b78e511ed5792812e873d2c427 |
Public Notes
Text: | Permit #47916 Approved for a 3 bdrm Type III mound septic with operating permit #833 |
File(s): |
|
Admin Checklist
Date application was complete: | 06/09/2023 |
This review has been started by: | Shannon Wiebusch |
Zoning District of project location: | Shoreland |
Required OHWL setback distance: | |
"Other" OHWL setback distance is: | |
Pumping Agreement Attached? | |
Low Interest Loan or SSTS Grant project? | |
Is this an After-The-Fact application? | No |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
DESIGN REVIEW CHECKLIST
Design Reviewed By: | Kevin Turnock |
SSTS Type: | Type III |
SSTS Design: | "Other"/Performance System (III, IV, V) |
New or Replacement SSTS: | Replacement SSTS |
GPD: | 1-2,499 gpd |
# of bedrooms: | 3 |
Is this a Cluster System? | No |
Does this system belong to an Other Establishment? | No |
Does this system require an Operating Permit? | Yes |
Operating Permit #: | 833 |
Additional info (optional): |