OneGov
App. Status: DeniedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
If we have questions on the application who should we contact? |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Project Location Search
Property: |
|
Driving directions to the property from Aitkin.: | go north on 169/210 follow 210 east to county road #5, go north approximately 2.5 miles to 301st Ave (Fleming lake Cemetery sign on right/Fleming town hall on right also) go left, two lots past public access on Right 42823 green building. |
Project Description
Please describe your proposed project: | bring in fill sand, along west side of landing to help with water run off from neighbors landing, put a small water holding area on east side to hold water so it can drain back into the lake naturally, then cover the fill sand with black dirt to make the landing so it doesn't get flooded from neighbors water run off, also am trying to put some natural plants by lake shore to hold back the ice heaves if possible to find something like this. |
Will you be removing vegetation during this project? | No |
Site Drawing(s)
Land Alteration Site Sketch Checklist: | Location and size of all existing structures. Location and size of all proposed structures. Location of all driveways and/or access roads. Location of wetlands. Location and size of alteration. Location of erosion control measures. Location of fill disposal, if done on site. Distance of alteration to OHWL (closest point) Distance of alteration to property lines. Distance of alteration to existing structures. Distance of alteration to proposed structures. Cross-section of cut and/or fill locations. |
Attach a copy of your Site Sketch(s): |
|
Excavation Details
Nature of Material to be used?
(Check all that apply) |
Black Dirt Sand |
Total Amount of Excavation and/or Fill proposed? (cubic yards) | 30 CuYd |
Total Area to be Graded and/or Filled? (L x W) | 4030 ft2 |
Attach a photo of the area to be altered (as it exists today).: |
|
Erosion Control Practices
Indicate the following erosion control measures that will be used throughout and after your project? (Check all that apply) |
Silt Fence |
Describe how you intend to implement this plan and your finished vegetation plan.: |
try to find some native plants to grow to help with erosion later on. |
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.
I acknowledge that by submitting this application, the application and its attachments are public information.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #57412 (05/15/2023)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 05/15/2023 3:55 PM $200 Flat Fee |
$200.00 | x 1 | $200.00 |
Grand Total | |||
Total | $200.00 | ||
Payment 05/15/2023 | $200.00 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Jay Eull - 05/15/2023 3:59 PM 8c80515eacf7e20eec1bea91846a53a4 e09c2387ebbd1064bde92fec44296d90 | |
#1 Adminstrative Approval Group | Henry Egland - 05/16/2023 8:39 AM 1b712223dc54b409b5b0fc70edbe2c5c f052037c975def2e681a769fe50d2bfb |
Text: | Denied - Land Alteration *Site visit conducted Refund issued 6/16/23 $100 KB |
File(s): |
Text: | |
File(s): |
Date application was complete: | 05/15/2023 |
This review has been started by: | Henry Egland |
Zoning District of project location: | Shoreland |
Zoning Inspector: | Henry Egland |
Attach necessary inspection forms: |
|
Is the project in the Shore Impact Zone? | Yes |
Was an onsite conducted for this application? | Yes |
Is this an After-The-Fact application? | No |
Project located in the floodplain? | No |
Base Flood Elevation: |