Land Use Application Permit # 2023-0328, App. # App-2023-000374, UID # 207597
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

Enter Applicant Contact Information:
Name:
Richard Karel
Phone:
(651636 - 9181
Email Address:
richkarel@centurylink.net
Mailing Address:
5546 Fenway Ct
White Bear Township MN 55110
Are you the Property Owner? Yes

Property Location

Property Location:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
34-1-08090012247 104th Pl
FINLAYSON, MN 55735
WAGNER TWPWOODHAVENS:24 T:43 R:22RDPINE LAKE (WAGNER TWP)KAREL, RICHARD & ELIZKAREL, RICHARD & ELIZ
Enter directions to the property (if no property address assigned):
Hwy47 east/south to Hwy18 east to#38(Big Pine road) south onto 100th ave -right on #23(Alder Street) - left on 124th Lane - left on 104th Place to 12247.- bear left at bottom of driveway

Project Checklist

1.) Is the property zoned Shoreland? Yes
3.) Are there any wetlands or lowlands on/near the project site? No
4.) Will the structure(s) be used for commercial purposes? No
5.) Is there an existing septic system on the property?
(Outhouse/Privies are also considered septic systems)
Yes
6.) Are you applying to install a new septic system? No

Existing Septic Status

Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? Yes

Project Description

Please describe your proposed project:
Proposing to build a Rec room next  to my garage. size: 14ft x 26ft- one story high- roof approx 1 ft higher than garage roof.

Project Type

Item 1 - Structure Type: Accessory Building
Item 1 - Size: 364 ft2

Shoreland Data

Setback distance from Ordinary High Water Level to the proposed construction? (closest point) 100 Feet
Will the proposed structure(s) be less than 35 foot maximum height? Yes
Are you constructing a walkout basement? No
If you are building an accessory structure, will there will be a loft or second story? No

Natural Landscape Protection Plan

Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? No
How many cubic yards of fill or excavation will be done on the property? 30 CuYd
How close to the property line will any fill be placed or any excavation be done? 26 Feet
What percent slope of the land currently exists on the project site? 0 % slope
Select the erosion control methods that will be used throughout and after your project:
(Check all that apply)
Other (explain below)
Other:
Build site is behind house- fill required is inside foundation. Garden along side building and rest of bank seeded

Site Plan

Please include all applicable items from the checklist on your site plan. See example site plan below:
All Existing Structures & Dimensions
All Proposed Structures & Dimensions
Location of Driveways & Access Roads
Location of Well(s)
Location of Septic System(s)
Distance of Proposed Structures to Septic System(s)
Distance of Proposed Structures to Property Lines
Distance of Proposed Structures to Road Right-of-Way
Distance of Proposed Structures to Alley or Boulevard
Attach Site Plan:
Is the site staked and ready for inspection? Yes

Terms

Land Use/Septic Terms & Conditions
  • All appropriate permit fees must be paid in full prior to any necessary review(s) of application.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.

  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • Permit fees are non-refundable after a permit has been approved.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."

  • Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

  • I acknowledge that by submitting this application, the application and its attachments are public information.

Invoice #57311 (05/22/2023)

Charge Cost Quantity Total
Non-Taxable
added 05/22/2023 12:11 PM

$200 Flat Fee

$200.00 x 1 $200.00
Grand Total
Total $200.00
Payment 05/22/2023$200.00
Due$0.00

Approvals

ApprovalSignature
ApplicantRichard P. Karel - 05/22/2023 12:12 PM
3bd04c7befd259f02eea9cb65bec15ad
908e4e60234017c076968f62467b4f33
#1 Adminstrative Approval GroupConnor Plagge - 05/22/2023 2:46 PM
4e34e44bc73a58af2ccf6252c0e60fb6
f6a369db99e9a033709287c414acd5b2
#2 Inspector GroupBrock Anderson - 05/26/2023 12:04 PM
e0dc22355d62fdc92ccf6a9b3ea69f68
502b089d353b2f52314ad0094c347082
#3 Level Three Final ActionConnor Plagge - 05/26/2023 12:45 PM
1c9e5b629b063ce0ac05955039f77ee2
dad21f690d2982e2bfe36e8ecadfd224
Application has been approved. All signatures have been obtained.

Public Notes

Text:
Permit #47771

Approved for 
 -364 sq/ft Accessory Building (Addition 14x26)
File(s):

Admin Checklist

Date application was complete: 05/22/2023
Review started by: Connor Plagge
Zoning District of project location: Shoreland
Required OWHL setback distance: 100 ft.
"Other" OHWL setback distance is:
Project located in the floodplain? No
Base Flood Elevation:
Lowest Floor Elevation:
Is an after construction elevation certificate required?
Property line setbacks appear to be met? Yes
Road R-O-W setbacks appear to be met? Yes
Bluff setbacks appear to be met? N/A
Septic Tank setback appears to be met with/without an engineer's report? Yes
Septic Drainfield setback appears to be met with/without an engineer's report? Yes
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? Yes
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? Redevelopment
Is this After-The-Fact? No

Inspector Checklist

Zoning Inspector: Brock Anderson
Attach necessary inspection forms/photos:
Notes:
Was an onsite conducted for this application? Yes