OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219, Aitkin, MN 56431
Email: aitkinpz@aitkincountymn.gov
Phone: 218-927-7342
Fax: 218-927-4372
Property Location
Property Location: |
|
Site Plan
Attach Site Plan: |
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
Permit fees are non-refundable after a permit has been approved.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
I acknowledge that by submitting this application, the application and its attachments are public information.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
Invoice #57133 (04/12/2023)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 04/12/2023 3:13 PM $200 Flat Fee |
$200.00 | x 1 | $200.00 |
Grand Total | |||
Total | $200.00 | ||
Payment 04/12/2023 | $200.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Joseph Elvecrog - 04/12/2023 4:50 PM 75d7c78c85835219fecb3e49736ccc22 8103ff0fc9f43d06e5b68d0967ffb57b |
#1 Adminstrative Approval Group | Connor Plagge - 04/14/2023 8:10 AM 80df8c29c7c5f0167728a85703f5b0ba 7774dc1e6b003c527731942fd49408a7 |
#2 Inspector Group | Jody Grund - 04/18/2023 9:48 AM 838d22c495512bdf824364c13afec987 0e3a2eddc51c7d5c74e0ee6deebd6cbf |
#3 Level Three Final Action | Kim Burton - 04/20/2023 12:06 PM 25ab3823ae590cdd6611e983d3640c37 72937c2053f66ea3ca128ca1c1589fd6 |