Enter Applicant Contact Information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | No |
Property Owner Contact
Property Owner Email: | josh@mnacoustics.com | ||||
Property Owner Phone: |
|
Property Location
Property Location: |
|
Enter directions to the property (if no property address assigned): | Head east on 290th Street for 3 miles. North on 400th Ave for 2 miles. West on Oak Ave for 1/4 mile. West on Diamond Lake St for 14 mile. Right on 310th Ln and then imeddiately right on 406th Ln. S |
Project Checklist
1.) Is the property zoned Shoreland? | Yes |
3.) Are there any wetlands or lowlands on/near the project site? | No |
4.) Will the structure(s) be used for commercial purposes? | No |
5.) Is there an existing septic system on the property? (Outhouse/Privies are also considered septic systems) |
Yes |
6.) Are you applying to install a new septic system? | No |
Existing Septic Status
Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? | Yes |
Project Description
Please describe your proposed project: | Removal of existing garage and construction of new 40x60 Morton Building to used for storage. Will have 8x60 porch one side of structure. |
Project Type
Item 1 - Structure Type: | Accessory Building |
Item 1 - Size: | 2880 ft2 |
Shoreland Data
Setback distance from Ordinary High Water Level to the proposed construction? (closest point) | 200 Feet |
Will the proposed structure(s) be less than 35 foot maximum height? | Yes |
Are you constructing a walkout basement? | No |
If you are building an accessory structure, will there will be a loft or second story? | No |
Natural Landscape Protection Plan
Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? | No |
How many cubic yards of fill or excavation will be done on the property? | 150 CuYd |
How close to the property line will any fill be placed or any excavation be done? | 75 Feet |
What percent slope of the land currently exists on the project site? | 5 % slope |
Select the erosion control methods that will be used throughout and after your project: (Check all that apply) |
Seeding and/or Mulching |
Site Plan
Attach Site Plan: |
|
Is the site staked and ready for inspection? | No |
Additional Info
Additional info: (optional) |
Site will be staked once the snow melts. |
Attachments: (e.g. blueprints, floor plan, compliance inspection, or other information) |
|
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Permit fees are non-refundable after a permit has been approved.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
I acknowledge that by submitting this application, the application and its attachments are public information.
Invoice #57070 (04/04/2023)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 04/04/2023 9:45 AM $300 Flat Fee |
$300.00 | x 1 | $300.00 |
Grand Total | |||
Total | $300.00 | ||
Payment 04/04/2023 | $300.00 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Jerry Johnson - 04/24/2023 3:31 PM e9e6a4c40cf1a6dd089683c88deb9d7c e793839c84ff90999411b87d2e190060 | |
#1 Adminstrative Approval Group | Connor Plagge - 04/25/2023 12:22 PM 98bb75119e73f1d4a696494811a0001a fd77bdede64c95ffb231cbbc08278839 | |
#2 Inspector Group | Connor Plagge - 04/26/2023 4:26 PM a56e5eeaf4da257c56cf531936a1b8a9 3c8058bcc249a9741c4ac50e542e10a3 | |
#3 Level Three Final Action | Connor Plagge - 04/27/2023 8:49 AM dff82718fc6bfb0a9eff88c3ca5e8b60 968e147868c4772e86171601b32d34a5 |
Text: | Approved for a 2880 sq ft (48'x60') Accessory Building with one condition; 1. The Salem Villa RV must be stored or placed meeting all applicable setbacks by October 26th, 2023. |
File(s): |
|
Text: | |
File(s): |
Date application was complete: | 04/24/2023 |
Review started by: | Connor Plagge |
Zoning District of project location: | Shoreland |
Required OWHL setback distance: | 100 ft. |
"Other" OHWL setback distance is: | |
Project located in the floodplain? | No |
Base Flood Elevation: | |
Lowest Floor Elevation: | |
Is an after construction elevation certificate required? | |
Property line setbacks appear to be met? | Yes |
Road R-O-W setbacks appear to be met? | No |
Bluff setbacks appear to be met? | N/A |
Septic Tank setback appears to be met with/without an engineer's report? | Yes |
Septic Drainfield setback appears to be met with/without an engineer's report? | Yes |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? | Redevelopment |
Is this After-The-Fact? | No |
Zoning Inspector: | |
SSTS Type: | |
SSTS Design: | |
New or Replacement SSTS: | |
GPD: | |
# of bedrooms: | |
Does this system require an Operating Permit? | |
Operating Permit #: | |
Does this system belong to an other establishment? | |
Is this a Cluster System? | |
Attachments: |
Zoning Inspector: | Connor Plagge |
Attach necessary inspection forms/photos: |
|
Notes: | Appears to meet all setbacks. Will need to move RV to meet ROW setbacks. |
Was an onsite conducted for this application? | Yes |
Self Install? | |
Installer Name: |
None
|
New Tanks: | |
Existing Tanks: | |
Date of Final Inspection: | |
Attach Final Certificate of Installation: | |
Low Interest Loan or SSTS Grant project? |