OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Enter Applicant Contact Information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Property Location
Property Location: |
|
Enter directions to the property (if no property address assigned): | highway 65 south to highway 18 west about 3 miles to 240th place go south to the end of road |
Project Checklist
1.) Is the property zoned Shoreland? | No |
3.) Are there any wetlands or lowlands on/near the project site? | No |
4.) Will the structure(s) be used for commercial purposes? | No |
5.) Is there an existing septic system on the property? (Outhouse/Privies are also considered septic systems) |
Yes |
6.) Are you applying to install a new septic system? | No |
Existing Septic Status
Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? | Yes |
Project Description
Please describe your proposed project: | 42x64 12 side walls pole barn |
What is the height of your structure? | 18 Feet |
Project Type
Item 1 - Structure Type: | Accessory Building |
Item 1 - Size: | 2688 ft2 |
Site Plan
Attach Site Plan: |
|
Is the site staked and ready for inspection? | No |
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Permit fees are non-refundable after a permit has been approved.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
I acknowledge that by submitting this application, the application and its attachments are public information.
Invoice #56922 (02/28/2023)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 02/28/2023 7:40 PM $300 Flat Fee |
$300.00 | x 1 | $300.00 |
Grand Total | |||
Total | $300.00 | ||
Payment 02/28/2023 | $300.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | paul r. arens - 02/28/2023 7:47 PM ef61478c0cf5f2f8625b23a88c491bdf 2671bb8389f5c8cc30b4cdd80ae33089 |
#1 Adminstrative Approval Group | Henry Egland - 03/06/2023 10:59 AM 70d939b7ef561801ba450c4146192dd0 c43b8c3aa22db1718281ccea37e4727b |
#2 Inspector Group | Henry Egland - 03/06/2023 11:00 AM 66e07a3b117b2009cb555e5c114e1f2d d1217ff88cdbd780262ef9dfb11bc4c2 |
#3 Level Three Final Action | Connor Plagge - 03/06/2023 11:49 AM 329df970ff560eabef82222242720667 e969b01f943ced233f57f91de7af4d1e |
Public Notes
Text: | Permit #47582 Approved for 42'x64' accessory structure. Not for commercial use. Not for human habitation. |
File(s): |
|
Admin Checklist
Date application was complete: | 03/06/2023 |
Review started by: | Henry Egland |
Zoning District of project location: | Open |
Required OWHL setback distance: | |
"Other" OHWL setback distance is: | |
Project located in the floodplain? | |
Base Flood Elevation: | |
Lowest Floor Elevation: | |
Is an after construction elevation certificate required? | |
Property line setbacks appear to be met? | Yes |
Road R-O-W setbacks appear to be met? | Yes |
Bluff setbacks appear to be met? | N/A |
Septic Tank setback appears to be met with/without an engineer's report? | Yes |
Septic Drainfield setback appears to be met with/without an engineer's report? | Yes |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? | Redevelopment |
Is this After-The-Fact? | No |
Inspector Checklist
Zoning Inspector: | Henry Egland |
Attach necessary inspection forms/photos: | |
Notes: | Setback were met by GIS analysis. |
Was an onsite conducted for this application? | No |