OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Enter Applicant Contact Information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Property Location
Property Location: |
|
Enter directions to the property (if no property address assigned): | Take 169 North to CR3 (480th Street) and make a right (East) and go approx. 2 miles past the main town of Palisade. Once you reach 285th, make a right (South) -this is our driveway. |
Project Checklist
1.) Is the property zoned Shoreland? | No |
3.) Are there any wetlands or lowlands on/near the project site? | No |
4.) Will the structure(s) be used for commercial purposes? | No |
5.) Is there an existing septic system on the property? (Outhouse/Privies are also considered septic systems) |
Yes |
6.) Are you applying to install a new septic system? | No |
Existing Septic Status
Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? | Yes |
Project Description
Please describe your proposed project: | Our crawl space has issues and needs to be dug out and rebuilt. This will eliminate frost heaving and flooding under the home. Something we learned has been an issue for decades, but which was never disclosed to us when we bought the property. The crawl space will have an additional 3-4 feet and will provide basement space (unfinished/raw) which will properly support the home. The home doesn't have the correct support and has frost heaving issues. Because of the additions that were done throughout the years (which were permitted and prior to our purchase) the home cannot be lifted to correct. We are needing to get this completed to ensure the longevity of the home and structure. We plan on living here a long time and want to make sure the crawl space is done correctly. |
What is the height of your structure? | 4 Feet |
Project Type
Item 1 - Structure Type: | Residence Addition |
Item 1 - Size: | 600 ft2 |
Site Plan
Attach Site Plan: |
|
Is the site staked and ready for inspection? | Yes |
Additional Info
Additional info: (optional) |
There won't be any "additions" per se, just a corrected crawl space which will be an enclosed area like that of a basement but without bathroom facilities, etc. It will be concrete, block, and beams to support the house properly and to stop the frost heaves. If anything else is needed, please feel free to reach out. We appreciate it - this should've been disclosed to us when we purchased the property but it wasn't and it needs to corrected. :( |
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Permit fees are non-refundable after a permit has been approved.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
I acknowledge that by submitting this application, the application and its attachments are public information.
Invoice #56896 (02/21/2023)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 02/21/2023 2:12 PM $400 Flat Fee |
$400.00 | x 1 | $400.00 |
Grand Total | |||
Total | $400.00 | ||
Payment 02/21/2023 | $400.00 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Michelle A. Pieterse - 02/21/2023 2:13 PM 44df1372ed98c044e416a22d37014cd3 90bbbbefe32a395d82f5aad6266f88ec | |
#1 Adminstrative Approval Group | Connor Plagge - 02/21/2023 3:30 PM c26be82be65b0d843f95dd8476857e07 7c3bbeaadb92ae599afcbf772354a7a7 | |
#2 Inspector Group | Connor Plagge - 02/21/2023 3:31 PM d019481484b72e3ea03b759b477e24b2 1a25193cef2982fcf446cb7d22e71c1d | |
#3 Level Three Final Action | Connor Plagge - 02/21/2023 3:45 PM 8ddbfb790566c83e1fa2f7905bf51580 6ca0869ac3e91c6481384e74e365320b |
Text: | Permit #47570 Approved for a 600 sq ft Residence Addition. |
File(s): |
|
Text: | |
File(s): |
Date application was complete: | 02/21/2023 |
Review started by: | Connor Plagge |
Zoning District of project location: | Open |
Required OWHL setback distance: | |
"Other" OHWL setback distance is: | |
Project located in the floodplain? | No |
Base Flood Elevation: | |
Lowest Floor Elevation: | |
Is an after construction elevation certificate required? | |
Property line setbacks appear to be met? | Yes |
Road R-O-W setbacks appear to be met? | Yes |
Bluff setbacks appear to be met? | N/A |
Septic Tank setback appears to be met with/without an engineer's report? | Yes |
Septic Drainfield setback appears to be met with/without an engineer's report? | Yes |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? | Redevelopment |
Is this After-The-Fact? | No |
Zoning Inspector: | |
SSTS Type: | |
SSTS Design: | |
New or Replacement SSTS: | |
GPD: | |
# of bedrooms: | |
Does this system require an Operating Permit? | |
Operating Permit #: | |
Does this system belong to an other establishment? | |
Is this a Cluster System? | |
Attachments: |
Zoning Inspector: | Connor Plagge |
Attach necessary inspection forms/photos: |
|
Notes: | All setbacks appear to be met. |
Was an onsite conducted for this application? | Yes |
Self Install? | |
Installer Name: |
None
|
New Tanks: | |
Existing Tanks: | |
Date of Final Inspection: | |
Attach Final Certificate of Installation: | |
Low Interest Loan or SSTS Grant project? |