If we have questions on the application who should we contact? |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Project Location Search
Property: |
|
Driving directions to the property from Aitkin.: | 19926 508TH LN MCGREGOR MN 55760 Cross pond, take a left. Last house at the end of the road. |
Project Description
Please describe your proposed project: | Project as proposed will replace a previous permit of shoreline vegetation. Objective is to create a recreational access to the lake via means of moving some boulders around. The current natural shoreline has had some erosion and damage by ice pushing the boulders. Strategic placement and size of boulders would eliminate future damage by allowing the ice to move up and over the rocks in lieu of pushing them back into the ground / shoreline. Area to be affect is approx. 10' deep x 40' wide. |
Will you be removing vegetation during this project? | Yes |
Site Drawing(s)
Land Alteration Site Sketch Checklist: | Location and size of all existing structures. Location and size of all proposed structures. Location of all driveways and/or access roads. Location of wetlands. Location and size of alteration. Location of erosion control measures. Location of fill disposal, if done on site. Distance of alteration to OHWL (closest point) Distance of alteration to property lines. Distance of alteration to existing structures. Distance of alteration to proposed structures. Cross-section of cut and/or fill locations. |
Attach a copy of your Site Sketch(s): |
|
Vegetation Removal
Number of Trees to be removed: | 3 |
Number of Shrubs to be removed: | 4 |
Type of Clearing Used?
(Check all that apply) |
Mechanical Clearing |
Please explain: | The intent would be to use a mini backhoe with a grapple to move / place / boulder to create an rip rap condition vs to allow for ice heaves to go up and over vs. pushing boulders into land. See pic's. The would also provide means to lake access for recreational use such as getting docks in and out. |
Excavation Details
Nature of Material to be used?
(Check all that apply) |
Boulders |
Total Amount of Excavation and/or Fill proposed? (cubic yards) | 0 CuYd |
Total Area to be Graded and/or Filled? (L x W) | 400 ft2 |
Attach a photo of the area to be altered (as it exists today).: |
|
Erosion Control Practices
Indicate the following erosion control measures that will be used throughout and after your project? (Check all that apply) |
Other (explain below) |
If other, please explain: | The intent would be to do this work in the winter. |
Describe how you intend to implement this plan and your finished vegetation plan.: |
Place boulders along shorline. Ice conditions. Minimal erosion if any would take place. |
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.
I acknowledge that by submitting this application, the application and its attachments are public information.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #56642 (12/12/2022)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 12/12/2022 3:06 PM $200 Flat Fee |
$200.00 | x 1 | $200.00 |
Grand Total | |||
Total | $200.00 | ||
Payment 12/12/2022 | $200.00 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant |
Text: | Denied Site inspection was conducted. Refund $100 Refund issued 8/11/23 KB |
File(s): |
Text: | |
File(s): |
Date application was complete: | |
This review has been started by: | |
Zoning District of project location: |
Zoning Inspector: | |
Attach necessary inspection forms: | |
Is the project in the Shore Impact Zone? | |
Was an onsite conducted for this application? | |
Is this an After-The-Fact application? | |
Project located in the floodplain? | |
Base Flood Elevation: |