OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Enter Applicant Contact Information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Property Location
Property Location: |
|
Enter directions to the property (if no property address assigned): | Hwy 210 East to HWY 65 at McGregor intersection. Go North to Sathers Store for 7 miles. Turn rt on co RD 14. Go 5 miles to bridge. Driveway is 2nd on the rt past the bridge. |
Project Checklist
1.) Is the property zoned Shoreland? | Yes |
3.) Are there any wetlands or lowlands on/near the project site? | Yes |
4.) Will the structure(s) be used for commercial purposes? | No |
5.) Is there an existing septic system on the property? (Outhouse/Privies are also considered septic systems) |
No |
6.) Are you applying to install a new septic system? | Yes |
Septic Type
Select the type of septic you are applying for: | Residential Bed (Type 1) |
Design Information
Attach Septic Design & Management Plan: |
|
Attach Compliance Inspection.: | |
Septic Designer: |
None
|
Operating Permit
Attach the Operating Permit Application & Operating Permit Maintenance Contract: |
Pumping Agreement
Attach Pumping Agreement: |
Installer
Self Install or Licensed Install: | Licensed Septic Installer |
Licensed Installer Name: |
None
|
Installer License # : | 211 |
Project Description
Please describe your proposed project: | I am proposing to build a 30x62 modular home with a walk out basement and attached 30x30 garage. |
What is the height of your structure? | 20 Feet |
Project Type
Item 1 - Structure Type: | New Residence incl. attached decks/porches/garages |
Item 1 - Size: | 2800 ft2 |
Shoreland Data
Setback distance from Ordinary High Water Level to the proposed construction? (closest point) | 25 Feet |
Will the proposed structure(s) be less than 35 foot maximum height? | Yes |
Are you constructing a walkout basement? | Yes |
If you are building an accessory structure, will there will be a loft or second story? | No |
Natural Landscape Protection Plan
Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? | No |
How many cubic yards of fill or excavation will be done on the property? | 190 CuYd |
How close to the property line will any fill be placed or any excavation be done? | 25 Feet |
What percent slope of the land currently exists on the project site? | 2 % slope |
Select the erosion control methods that will be used throughout and after your project: (Check all that apply) |
|
6.) What will be done after construction to control erosion? |
Seed or sod. |
Site Plan
Attach Site Plan: |
|
Is the site staked and ready for inspection? | Yes |
Additional Info
Additional info: (optional) |
This is floorplan of the house that will be put on the property. |
Attachments: (e.g. blueprints, floor plan, compliance inspection, or other information) |
|
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Permit fees are non-refundable after a permit has been approved.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
I acknowledge that by submitting this application, the application and its attachments are public information.
Invoice #56543 (11/18/2022)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 11/18/2022 1:23 PM $550 Flat Fee |
$550.00 | x 1 | $550.00 |
added 11/09/2022 10:38 AM $300 Flat Fee |
$300.00 | x 1 | $300.00 |
Grand Total | |||
Total | $850.00 | ||
Payment 11/18/2022 | $850.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Lisa A. Palmer - 11/18/2022 1:23 PM 9d5c595036357e0c6685d13552fa5388 bb87be60a67bd8f30699af34a23e15d2 |
#1 Adminstrative Approval Group | Connor Plagge - 11/22/2022 9:32 AM 3af31d5e73dcf79917a2d4648e21e987 bfb7f14d4a769e5547733f804f26bfa5 |
#2 Inspector Group | Connor Plagge - 11/28/2022 9:28 AM 05965a2400807ea801248c83da375938 62e20a546513d893104d3b39dca7bf15 |
#3 Level Three Final Action | Kim Burton - 11/28/2022 3:54 PM 723ccbba4e19b18ecb8bf042074c31ee fd4149b743dc1e1d27d3799948eedb70 |
Public Notes
Text: | Permit # 47499. Approved for a 2800 sq ft New Residence incl. attached decks/porches/garages and a 3 bdrm Type I pressure bed septic. |
File(s): |
|
Admin Checklist
Date application was complete: | 11/18/2022 |
Review started by: | Connor Plagge |
Zoning District of project location: | Shoreland |
Required OWHL setback distance: | |
"Other" OHWL setback distance is: | |
Project located in the floodplain? | No |
Base Flood Elevation: | |
Lowest Floor Elevation: | |
Is an after construction elevation certificate required? | |
Property line setbacks appear to be met? | Yes |
Road R-O-W setbacks appear to be met? | Yes |
Bluff setbacks appear to be met? | N/A |
Septic Tank setback appears to be met with/without an engineer's report? | Yes |
Septic Drainfield setback appears to be met with/without an engineer's report? | Yes |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? | |
Is this After-The-Fact? | No |
Inspector Checklist
Zoning Inspector: | Connor Plagge |
Attach necessary inspection forms/photos: |
|
Notes: | Appears to meet all setbacks. Old cabin is "grouped" with three parcels and new house is "grouped" with four parcels. This allows for development of the property as the old cabin is over guest cottage size and new house is over 700 sq ft. |
Was an onsite conducted for this application? | Yes |