Land Use Application Permit # 2022-8418, App. # App-2022-009720, UID # 206688
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

Enter Applicant Contact Information:
Name:
Barry Dennis Sullivan
Phone:
(218513 - 1152
Email Address:
outpost.forestry@icloud.com
Mailing Address:
27522 State Highway 47
Aitkin MN 56431 2062
Are you the Property Owner? Yes

Property Location

Property Location:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
21-0-00640027522 STATE HWY 47
AITKIN, MN 56431
MALMO TWPS:4 T:45 R:25SULLIVAN, BARRYSULLIVAN, BARRY
Enter directions to the property (if no property address assigned):
south of aitkin on hwy 47, just south of Glen.

Project Checklist

1.) Is the property zoned Shoreland? No
3.) Are there any wetlands or lowlands on/near the project site? No
4.) Will the structure(s) be used for commercial purposes? No
5.) Is there an existing septic system on the property?
(Outhouse/Privies are also considered septic systems)
Yes
6.) Are you applying to install a new septic system? No

Existing Septic Status

Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? Yes

Project Description

Please describe your proposed project:
applying for 8x40 storage container after-the-fact.

Project Type

Item 1 - Structure Type: Accessory Building
Item 1 - Size: 320 ft2

Site Plan

Attach Site Plan:
Is the site staked and ready for inspection? Yes

Additional Info

Additional info:
(optional)
compost toilet for septic

Terms

Land Use/Septic Terms & Conditions
  • All appropriate permit fees must be paid in full prior to any necessary review(s) of application.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.

  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • Permit fees are non-refundable after a permit has been approved.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."

  • Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

  • I acknowledge that by submitting this application, the application and its attachments are public information.

Invoice #56446 (10/20/2022)

Charge Cost Quantity Total
Non-Taxable
added 10/20/2022 1:24 PM

$200 Flat Fee

$200.00 x 1 $200.00
Grand Total
Total $200.00
Payment 10/20/2022$200.00
Due$0.00

Approvals

ApprovalSignature
ApplicantBarry Sullivan - 10/20/2022 1:25 PM - witnessed by Shannon Wiebusch
77a441e14c6a4910e2f0a00687dfa5db
42fe763a854e391c291c4f1283a47928
#1 Adminstrative Approval GroupShannon Wiebusch - 10/20/2022 2:42 PM
8cae35a98f5e92f8402814d31e499098
7b94f2deb00b1d0a285cef143e61a8a5
#2 Inspector GroupHenry Egland - 10/21/2022 8:17 AM
41c45074ca6337f378cdc5f271f53c38
56488573e25e0a07475b879fa2586207
#3 Level Three Final ActionShannon Wiebusch - 10/21/2022 9:29 AM
9809dc9a20eeffce8940fa447e7ed269
7399aed0ef544aae2cb575a27fa6e4f1
Application has been approved. All signatures have been obtained.

Public Notes

Text:
Permit 47406 Approved for 320 sq/ft accessory structure. Not for commercial use. Not for human habitation.
File(s):

Admin Checklist

Date application was complete: 10/20/2022
Review started by: Shannon Wiebusch
Zoning District of project location: Farm Residential
Required OWHL setback distance:
"Other" OHWL setback distance is:
Project located in the floodplain? No
Base Flood Elevation:
Lowest Floor Elevation:
Is an after construction elevation certificate required?
Property line setbacks appear to be met? Yes
Road R-O-W setbacks appear to be met? Yes
Bluff setbacks appear to be met? N/A
Septic Tank setback appears to be met with/without an engineer's report? N/A
Septic Drainfield setback appears to be met with/without an engineer's report?
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? Yes
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot?
Is this After-The-Fact? No

Inspector Checklist

Zoning Inspector: Henry Egland
Attach necessary inspection forms/photos:
    Notes:
    All setback are met.
    Was an onsite conducted for this application? No
    Powered by