OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Enter Applicant Contact Information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | No |
Property Owner Contact
Property Owner Email: | markkirchhof@charter.net | ||||
Property Owner Phone: |
|
Property Location
Property Location: |
|
Enter directions to the property (if no property address assigned): | Head south toward 1st St NW, Turn left onto 1st St NW, Turn left onto Minnesota Ave N, Continue straight to stay on Minnesota Ave N, Continue onto 410th Ave for about 1.3 miles, the property will be on the right |
Project Checklist
1.) Is the property zoned Shoreland? | Yes |
3.) Are there any wetlands or lowlands on/near the project site? | Yes |
4.) Will the structure(s) be used for commercial purposes? | No |
5.) Is there an existing septic system on the property? (Outhouse/Privies are also considered septic systems) |
No |
6.) Are you applying to install a new septic system? | Yes |
Septic Type
Select the type of septic you are applying for: | Residential Operating Permit (Type 3, 4, 5) |
Design Information
Attach Septic Design & Management Plan: | |
Septic Designer: |
None
|
Operating Permit
Attach the Operating Permit Application & Operating Permit Maintenance Contract: |
Pumping Agreement
Attach Pumping Agreement: |
Installer
Self Install or Licensed Install: | Licensed Septic Installer |
Licensed Installer Name: |
None
|
Installer License # : | 1792 |
If you selected Self Install please attach the signed Indemnification Form: |
Project Description
Please describe your proposed project: | To build new 3 bedroom home ( 46 x 56) with an attached garage (34 x 24). Pole building on site plan is not proposed right now. |
What is the height of your structure? | 21 Feet |
Project Type
Item 1 - Structure Type: | New Residence incl. attached decks/porches/garages |
Item 1 - Size: | 3641 ft2 |
Shoreland Data
Setback distance from Ordinary High Water Level to the proposed construction? (closest point) | 2585 Feet |
Will the proposed structure(s) be less than 35 foot maximum height? | Yes |
Are you constructing a walkout basement? | No |
If you are building an accessory structure, will there will be a loft or second story? | No |
Natural Landscape Protection Plan
Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? | No |
How many cubic yards of fill or excavation will be done on the property? | 830 CuYd |
How close to the property line will any fill be placed or any excavation be done? | 300 Feet |
What percent slope of the land currently exists on the project site? | 1 % slope |
Select the erosion control methods that will be used throughout and after your project: (Check all that apply) |
|
6.) What will be done after construction to control erosion? |
Lawn |
Site Plan
Attach Site Plan: |
|
Is the site staked and ready for inspection? | Yes |
Additional Info
Additional info: (optional) |
Fill for the house 330 yards for the inside of the structure 380 yards for the perimeter (outside) of the structure The driveway already is above the section 5 of the floodplain ordinance. We will be bringing in about 120 yards of class five for the driveway base. |
Attachments: (e.g. blueprints, floor plan, compliance inspection, or other information) |
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Permit fees are non-refundable after a permit has been approved.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
I acknowledge that by submitting this application, the application and its attachments are public information.
Invoice #56077 (09/06/2022)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 09/06/2022 9:35 AM $550 Flat Fee |
$550.00 | x 1 | $550.00 |
added 09/06/2022 9:35 AM $150 Flat Fee |
$150.00 | x 1 | $150.00 |
added 09/06/2022 9:35 AM $400 Flat Fee |
$400.00 | x 1 | $400.00 |
Grand Total | |||
Total | $1,100.00 | ||
Payment 09/06/2022 | $800.00 | ||
Payment 09/13/2022 | $300.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Andrew RANWEILER - 09/26/2022 10:04 AM 90a80945db4ca37bbb0213c23785e990 ac2004ce84a3bf13a76678f535889b5f |
#1 Adminstrative Approval Group | Shannon Wiebusch - 09/26/2022 8:14 AM 99e2e5f787038f968c6146574f9ac326 8386b9e042d814e3bebb624f0e9de2d8 |
#2 Inspector Group | Henry Egland - 09/29/2022 11:26 AM 24fff706afda7c222c5ea261a151c003 a7e78fdf44d53b5e2ef93c0e5f20683f |
#3 Level Three Final Action | Kim Burton - 09/29/2022 3:05 PM 151b61a759ba28c6888ddfa036aaa261 d91c079fd1f236914623227f8062367a |
Public Notes
Text: | Permit # 47340. Approved for 3641 sq/ft residence and 3 bdrm Type II mound septic with operating permit #803 (Type III mound in floodplain) condition of permit: Must provide a post-construction elevation certificate. Must comply with section 5 of the Floodplain Management Ordinance. Paid twice on the dwelling Refund to be issued. KB Paid $700 on 9/13/22 (only $300 was due). $400 refunded 9/21/22 KB |
File(s): |
|
Admin Checklist
Date application was complete: | 09/22/2022 |
Review started by: | Shannon Wiebusch |
Zoning District of project location: | Shoreland |
Required OWHL setback distance: | |
"Other" OHWL setback distance is: | shoreland because in the extent of the floodplain. |
Project located in the floodplain? | Yes |
Base Flood Elevation: | |
Lowest Floor Elevation: | |
Is an after construction elevation certificate required? | Yes |
Property line setbacks appear to be met? | Yes |
Road R-O-W setbacks appear to be met? | Yes |
Bluff setbacks appear to be met? | N/A |
Septic Tank setback appears to be met with/without an engineer's report? | Yes |
Septic Drainfield setback appears to be met with/without an engineer's report? | Yes |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? | |
Is this After-The-Fact? | No |
Inspector Checklist
Zoning Inspector: | Henry Egland |
Attach necessary inspection forms/photos: |
|
Notes: | All setbacks were met. |
Was an onsite conducted for this application? | Yes |