OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
If we have questions on the application who should we contact? |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Project Location Search
Property: |
|
Driving directions to the property from Aitkin.: | 169 south R on hwy 28 L on 310th St L on 454th Ave stay R on 456th Pl stay R on 457th Pl 30573 on R |
Project Description
Please describe your proposed project: | have already cleared a path to lake and along shoreline **working with Henry on after-the-fact permitting** |
Will you be removing vegetation during this project? | Yes |
Site Drawing(s)
Land Alteration Site Sketch Checklist: | Location of all driveways and/or access roads. Location of wetlands. |
Attach a copy of your Site Sketch(s): |
|
Vegetation Removal
Number of Trees to be removed: | 10 |
Number of Shrubs to be removed: | 10 |
Type of Clearing Used?
(Check all that apply) |
Mechanical Clearing Hand Clearing |
Please explain: | they used a skid steer I believe |
Excavation Details
Nature of Material to be used?
(Check all that apply) |
Sand Boulders |
Total Amount of Excavation and/or Fill proposed? (cubic yards) | 1000 CuYd |
Total Area to be Graded and/or Filled? (L x W) | 2000 ft2 |
Attach a photo of the area to be altered (as it exists today).: |
|
Erosion Control Practices
Indicate the following erosion control measures that will be used throughout and after your project? (Check all that apply) |
Seeding and/or Mulching |
If other, please explain: | water bars vegetation retaining wall |
Describe how you intend to implement this plan and your finished vegetation plan.: |
vegetation along path and shoreline water bars down slope boulders for retaining wall along sloped path |
Other Information
Other: | Henry has already been to property to inspect and we are working together on restoration plan |
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.
I acknowledge that by submitting this application, the application and its attachments are public information.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #55986 (08/25/2022)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 08/25/2022 10:01 AM $200 Flat Fee |
$200.00 | x 1 | $200.00 |
Grand Total | |||
Total | $200.00 | ||
Payment 08/25/2022 | $200.00 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Ryan Nichols - 08/25/2022 10:20 AM cfb975e7a1f83172cb0f96ce6a8d9380 852de4e110bc77322f8258277a280d57 | |
#1 Adminstrative Approval Group | Henry Egland - 08/26/2022 1:44 PM 4b2596847b77dc852cacf56179307e37 50cfc01ae81d572680a26ac9f748138d | |
#2 Inspector Group | Henry Egland - 08/26/2022 1:46 PM db9efd5bb95c3b1233f794a4e9a0e507 c3e1df2b9caff85ba371f086cebbac64 | |
#3 Final Action | Kim Burton - 08/28/2022 12:40 PM 180a29de322f9eaaf087b3d174bf567f d36904b4f54e110bca0300f2543c7b58 |
Text: | Permit # 47255. Approved for land alteration. Restoration plan must be implemented within one year of issued permit. |
File(s): |
|
Text: | |
File(s): |
Date application was complete: | 08/25/2022 |
This review has been started by: | Henry Egland |
Zoning District of project location: | Shoreland |
Zoning Inspector: | Henry Egland |
Attach necessary inspection forms: |
|
Is the project in the Shore Impact Zone? | Yes |
Was an onsite conducted for this application? | Yes |
Is this an After-The-Fact application? | Yes |
Project located in the floodplain? | No |
Base Flood Elevation: |