Land Use Application Permit # 2022-8146, App. # App-2022-009297, UID # 206012
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

Enter Applicant Contact Information:
Name:
Terry Christle
Phone:
(612242 - 8159
Email Address:
terrychristle66@gmail.com
Mailing Address:
7820 114th Avenue North
Champlin MN 55316
Are you the Property Owner? Yes

Property Location

Property Location:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
07-1-11910028665 456th Pl
AITKIN, MN 56431
FARM ISLAND TWPSUNSET ACRESS:31 T:46 R:27RDSUNSET LAKECHRISTLE, TERRY & PATRICIACHRISTLE, TERRY & PATRICIA
Enter directions to the property (if no property address assigned):
Take Hwy 169 south to Tame Fish Lake Road, turn right on Tame Fish Lake road, drive to Partridge Ave N, turn right and drive 2 miles to 456th Place, turn left and drive to address

Project Checklist

1.) Is the property zoned Shoreland? Yes
3.) Are there any wetlands or lowlands on/near the project site? No
4.) Will the structure(s) be used for commercial purposes? No
5.) Is there an existing septic system on the property?
(Outhouse/Privies are also considered septic systems)
Yes
6.) Are you applying to install a new septic system? No

Existing Septic Status

Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? Yes

Project Description

Please describe your proposed project:
Move existing 24x30 garage to backlot, build new 30x40 garage adjacent to moved (old) garage)
What is the height of your structure? 12 Feet

Project Type

Item 1 - Structure Type: Accessory Building
Item 1 - Size: 720 ft2
Item 2- Structure Type (if applicable): Accessory Building
Item 2 - Size: 1200 ft2

Shoreland Data

Setback distance from Ordinary High Water Level to the proposed construction? (closest point) 550 Feet
Will the proposed structure(s) be less than 35 foot maximum height? Yes
Are you constructing a walkout basement? No
If you are building an accessory structure, will there will be a loft or second story? No

Natural Landscape Protection Plan

Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? No
How many cubic yards of fill or excavation will be done on the property? 0 CuYd
How close to the property line will any fill be placed or any excavation be done? 20 Feet
What percent slope of the land currently exists on the project site? 0 % slope
Select the erosion control methods that will be used throughout and after your project:
(Check all that apply)
6.) What will be done after construction to control
erosion?
will establish grasses around non driving area of garage

Site Plan

Attach Site Plan:
Is the site staked and ready for inspection? Yes

Additional Info

Additional info:
(optional)
Please review for at least portion involving moving existing garage.  This garage can be moved rather then demolished, but need it out of the way for the house build.

Thank you so much, will be at property later this week if any questions.

Terms

Land Use/Septic Terms & Conditions
  • All appropriate permit fees must be paid in full prior to any necessary review(s) of application.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.

  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • Permit fees are non-refundable after a permit has been approved.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."

  • Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

  • I acknowledge that by submitting this application, the application and its attachments are public information.

Invoice #55786 (08/01/2022)

Charge Cost Quantity Total
Non-Taxable
added 08/01/2022 2:45 PM

$200 Flat Fee

$200.00 x 1 $200.00
added 08/01/2022 2:45 PM

$300 Flat Fee

$300.00 x 1 $300.00
Grand Total
Total $500.00
Payment 08/01/2022$500.00
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantTerry J. Christle - 08/01/2022 2:50 PM
8b6695d1c2fe13f1a6849f59d4cee36f
a1367e75e54e8e22b6f940d893c47aa5
 
#1 Adminstrative Approval GroupMolly Oestreich - 08/08/2022 9:31 AM
e9cad34b642f37c9f9b1bf9f52d5709d
42b31b16600c4556a4cfaf317fbcc989
 
#2 Inspector GroupConnor Plagge - 08/25/2022 9:38 AM
15c14962b4198fe7faa224ea2334a310
cd404d9699f5399285c084f0faedf61f
 
#3 Level Three Final ActionKim Burton - 08/25/2022 12:28 PM
0a880766417de0555210d2d91751a28a
071b282e7ee48cd05afa89005fc8f3c0
 
Application has been approved. All signatures have been obtained.
Text:
Permit # 47244. Approved for a 720 sq ft Accessory building and a 1200 sq ft Accessory building.
File(s):
Text:
File(s):
    Date application was complete: 08/01/2022
    Review started by: Molly Oestreich
    Zoning District of project location: Shoreland
    Required OWHL setback distance: 100 ft.
    "Other" OHWL setback distance is:
    Project located in the floodplain? No
    Base Flood Elevation:
    Lowest Floor Elevation:
    Is an after construction elevation certificate required?
    Property line setbacks appear to be met? Yes
    Road R-O-W setbacks appear to be met? Yes
    Bluff setbacks appear to be met? N/A
    Septic Tank setback appears to be met with/without an engineer's report? Yes
    Septic Drainfield setback appears to be met with/without an engineer's report? Yes
    Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? Yes
    Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot?
    Is this After-The-Fact? No
    Zoning Inspector:
    SSTS Type:
    SSTS Design:
    New or Replacement SSTS:
    GPD:
    # of bedrooms:
    Does this system require an Operating Permit?
    Operating Permit #:
    Does this system belong to an other establishment?
    Is this a Cluster System?
    Attachments:
      Zoning Inspector: Connor Plagge
      Attach necessary inspection forms/photos:
      Notes:
      Garage to be moved is shown above.
      Was an onsite conducted for this application? Yes
      Self Install?
      Installer Name:
      None
      New Tanks:
      Existing Tanks:
      Date of Final Inspection:
      Attach Final Certificate of Installation:
        Low Interest Loan or SSTS Grant project?
        Powered by