Land Alteration Permit # 47156, App. # App-2022-009254, UID # 205923
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

If we have questions on the application who should we contact?
Name:
james william over
Phone:
(412260 - 0636
Email Address:
jameswover@gmail.com
Mailing Address:
822 hillcrest cir
weford pa 15090
Are you the Property Owner? Yes

Project Location Search

Property:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
29-1-381000SHAMROCK TWPBIG SANDY LAKE HIGHLANDS SECOND ADDITIONS:4 T:49 R:23GDBIG SANDY LAKEOVER, JAMESOVER, JAMES
29-1-381100SHAMROCK TWPBIG SANDY LAKE HIGHLANDS SECOND ADDITIONS:4 T:49 R:23GDBIG SANDY LAKEOVER, JAMESOVER, JAMES
29-1-38120019504 520th Ln
MCGREGOR, MN 55760
SHAMROCK TWPBIG SANDY LAKE HIGHLANDS SECOND ADDITIONS:4 T:49 R:23GDBIG SANDY LAKEOVER, JAMESOVER, JAMES
29-1-381300SHAMROCK TWPBIG SANDY LAKE HIGHLANDS SECOND ADDITIONS:4 T:49 R:23GDBIG SANDY LAKEOVER, JAMESOVER, JAMES
Driving directions to the property from Aitkin.:
Aitkin to 19504 520th lane, McGregor MN 55760

US-169 north
MN-210 east
MN-65 north
Lake Ave east
520th lane north

Project Description

Please describe your proposed project:
Add rip-rap to shoreline of parcels 29-1-381100, 29010381200, and 29-1-3813  to control erosion.
Will you be removing vegetation during this project? No

Site Drawing(s)

Land Alteration Site Sketch Checklist:
Location and size of all existing structures.
Location and size of all proposed structures.
Location of all driveways and/or access roads.
Location and size of alteration.
Location of erosion control measures.
Distance of alteration to property lines.
Distance of alteration to existing structures.
Attach a copy of your Site Sketch(s):

Excavation Details

Nature of Material to be used?
(Check all that apply)
Rock
If other, please explain:
Add rip rap along shoreline to control erosion for approx. 125 feet. CuYd and SqFt are approximations.
Total Amount of Excavation and/or Fill proposed? (cubic yards) 50 CuYd
Total Area to be Graded and/or Filled? (L x W) 300 ft2
Attach a photo of the area to be altered (as it exists today).:

Erosion Control Practices

Indicate the following erosion control measures that
will be used throughout and after your project?
(Check all that apply)
Other (explain below)
If other, please explain:
What ever measures are required
Describe how you intend to implement this plan
and your finished vegetation plan.:
We plan no changes to the vegetation. It will remain as it has been since 1974, native plants and trees. We are trying to stop the destruction of this natural habitat and save as much of the shoreline as possible. Our plan is to protect the remaining shoreline from the increasing erosion caused by the dramatic changes in lake levels from the ACE dam, increasing severe weather, wake boats, and other sources of erosion.

Other Information

Other:
Our land was recently surveyed (2021) and stakes etc. are in place along with the surveyors drawings.

Terms

General Terms Zoning Permits
  • All appropriate permit fees must be paid in full prior to any necessary review(s) of application.

  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

  • To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.

  • I acknowledge that by submitting this application, the application and its attachments are public information.

Land Use/Septic General Terms
  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

Invoice #55699 (07/25/2022)

Charge Cost Quantity Total
Non-Taxable
added 07/23/2022 8:50 AM

$200 Flat Fee

$200.00 x 1 $200.00
Grand Total
Total $200.00
Payment 07/25/2022$200.00
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
Applicantjames w. over - 07/25/2022 10:19 AM
8b63a7d8fcf6259ca190949bd57e2e7a
889accf01f074674e30070d2fdb19da9
 
#1 Adminstrative Approval GroupHenry Egland - 07/25/2022 4:22 PM
e1f091d1bdb698fe935896c8d1a0dd05
7f60ca1591cf63af911dc0c8c7695e6e
 
#2 Inspector GroupHenry Egland - 07/28/2022 11:26 AM
483544d291dcb56eab4a231b4c3c2944
2d56d595e2fac40f737b3179e1f4c8e5
 
#3 Final ActionSarah McMillan - 07/28/2022 12:30 PM
692fb9048628572ae348084cae2b345a
755987df5553ad46b3efc310d5d30aef
 
Application has been approved. All signatures have been obtained.
Text:
Permit #47156
Approved for land alteration - Rip-rap

- Recommend additional native vegetation plantings above rip-rap
File(s):
Text:
File(s):
    Date application was complete: 07/25/2022
    This review has been started by: Henry Egland
    Zoning District of project location: Shoreland
    Zoning Inspector: Henry Egland
    Attach necessary inspection forms:
    Is the project in the Shore Impact Zone? Yes
    Was an onsite conducted for this application? Yes
    Is this an After-The-Fact application? No
    Project located in the floodplain? Yes
    Base Flood Elevation: