OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
If we have questions on the application who should we contact? |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | No |
Property Owner Contact
Property Owner Phone Number: |
|
||||
Property Owner Email Address: | mattew@taborpr.com |
Project Location Search
Property: |
|
Driving directions to the property from Aitkin.: | 65 right at sathers to 202nd |
Project Description
Please describe your proposed project: | redo 130ft of shoreline by 4 ft of with |
Will you be removing vegetation during this project? | No |
Site Drawing(s)
Land Alteration Site Sketch Checklist: | Location and size of all existing structures. |
Attach a copy of your Site Sketch(s): |
|
Excavation Details
Nature of Material to be used?
(Check all that apply) |
Rock |
Total Amount of Excavation and/or Fill proposed? (cubic yards) | 10 CuYd |
Total Area to be Graded and/or Filled? (L x W) | 240 ft2 |
Attach a photo of the area to be altered (as it exists today).: |
|
Erosion Control Practices
Indicate the following erosion control measures that will be used throughout and after your project? (Check all that apply) |
Seeding and/or Mulching |
Describe how you intend to implement this plan and your finished vegetation plan.: |
grass |
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.
I acknowledge that by submitting this application, the application and its attachments are public information.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #55667 (07/19/2022)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 07/19/2022 11:23 AM $200 Flat Fee |
$200.00 | x 1 | $200.00 |
Grand Total | |||
Total | $200.00 | ||
Payment 07/19/2022 | $200.00 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Greg Rono - 07/19/2022 11:23 AM e912f83460d0fc21f65c0ba2164bba6a a5f372d69b618511fbb42772e3f5cfa6 | |
#1 Adminstrative Approval Group | Henry Egland - 07/20/2022 9:35 AM 551153aabe985f2e67a9b79f2f83e2f5 82b699dc5b4b389447d081c6b4f32940 | |
#2 Inspector Group | Henry Egland - 07/21/2022 9:25 AM 9a7a82d39c5a826318249cb01193f6f6 90dcba0e556dfdce2700e2861daeafbe | |
#3 Final Action | Sarah McMillan - 07/21/2022 11:25 AM 44ad3236f62c44cbb11c6386390a6b31 855f92aeb0c4592b7a3402518a22383f |
Text: | Permit #47141 Approved for land alteration - Rip-rap. Rip-rap not to exceed line on photos attached. |
File(s): |
|
Text: | |
File(s): |
Date application was complete: | 07/19/2022 |
This review has been started by: | Henry Egland |
Zoning District of project location: | Shoreland |
Zoning Inspector: | Henry Egland |
Attach necessary inspection forms: |
|
Is the project in the Shore Impact Zone? | Yes |
Was an onsite conducted for this application? | Yes |
Is this an After-The-Fact application? | No |
Project located in the floodplain? | Yes |
Base Flood Elevation: |