Land Alteration Permit # 2022-8501, App. # App-2022-009154, UID # 205782
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

If we have questions on the application who should we contact?
Name:
Greg Rono
Phone:
(218839 - 3371
Email Address:
randrsales@live.com
Mailing Address:
42880 260th Lane
Aitkin MN 56431
Are you the Property Owner? No

Property Owner Contact

Property Owner Phone Number:
(763218 - 7476
Property Owner Email Address: emersonk@outlook.com

Project Location Search

Property:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
07-0-02150132809 420th Pl
AITKIN, MN 56431
FARM ISLAND TWPS:10 T:46 R:27RDHAMMAL LAKEEMERSON, KEVIN JEMERSON, KEVIN J
Driving directions to the property from Aitkin.:
169 to76 to daisey to 420th pl

Project Description

Please describe your proposed project:
rip rap 140 ft
Will you be removing vegetation during this project? No

Site Drawing(s)

Land Alteration Site Sketch Checklist:
Location and size of all existing structures.
Attach a copy of your Site Sketch(s):

Excavation Details

Nature of Material to be used?
(Check all that apply)
Rock
Total Amount of Excavation and/or Fill proposed? (cubic yards) 10 CuYd
Total Area to be Graded and/or Filled? (L x W) 240 ft2
Attach a photo of the area to be altered (as it exists today).:

Erosion Control Practices

Indicate the following erosion control measures that
will be used throughout and after your project?
(Check all that apply)
Seeding and/or Mulching
Describe how you intend to implement this plan
and your finished vegetation plan.:
grass

Terms

General Terms Zoning Permits
  • All appropriate permit fees must be paid in full prior to any necessary review(s) of application.

  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

  • To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.

  • I acknowledge that by submitting this application, the application and its attachments are public information.

Land Use/Septic General Terms
  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

Invoice #55562 (07/07/2022)

Charge Cost Quantity Total
Non-Taxable
added 07/07/2022 12:46 PM

$200 Flat Fee

$200.00 x 5 $1,000.00
Grand Total
Total $1,000.00
Payment 07/07/2022$200.00
Payment 11/10/2022$800.00
Due$0.00

Approvals

ApprovalSignature
ApplicantGreg Rono - 11/10/2022 8:50 AM - witnessed by Henry Egland
e302b1c9c87df2476047368dd15acbe3
b94d6e5cbdc7f44c9fe67dececaee8ad
#1 Adminstrative Approval GroupHenry Egland - 11/10/2022 8:51 AM
f4240a62a70ed82ac98db3381ee4c94a
0753fef6e00f7cdc77399f93058b9835
#2 Inspector GroupHenry Egland - 11/10/2022 8:55 AM
6b31c0e3a0e6d06585fd5d8a161f689e
2d6b16f63fd8e4bbed06824e83cb1cb6
#3 Final ActionKim Burton - 11/10/2022 9:03 AM
378626b864e5bfe4d004b3ee7074a37a
20c0f92e8c05de103ade279f770d6149
Application has been approved. All signatures have been obtained.

Public Notes

Text:
Permit #47470. Approved for ATF land alteration - Rip-rap

Condition: 3' un-mowed native vegetation buffer to be planted along entire length of rip-rap by July 31, 2023.
File(s):

Internal Notes

Text:
Rip-rap was installed without a pre-onsite inspection
File(s):
    Powered by