If we have questions on the application who should we contact? |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Project Location Search
Property: |
|
Driving directions to the property from Aitkin.: | From Aitkin: Due south on Hwy 169. Then west on Pioneer Avenue. Easement to the property is on the south side of Hwy 169. |
Project Description
Please describe your proposed project: | Respectfully request the following to address the current shoreline issues: 1) Shore erosion - 56 feet of rip rap of 3 feet in depth to areas that have demonstrated considerable shoreline erosion. 2) Dock and boat ramp ingress/egress - 14 feet of a ramp (gradual grade) to the OHWL to allow for dock and boat ramp transportation. Currently there is a 3-4 feet drop from the OWHL to the water level. The 14 feet of grade will be between the areas of rip rap to prevent erosion of the ramp. Only vegetation to be removed will be the area of grading where only grass will be removed and later reseeded around the periphery to prevent land erosion. |
Will you be removing vegetation during this project? | Yes |
Site Drawing(s)
Land Alteration Site Sketch Checklist: | Location and size of all existing structures. |
Attach a copy of your Site Sketch(s): |
|
Vegetation Removal
Number of Trees to be removed: | 0 |
Number of Shrubs to be removed: | 0 |
Type of Clearing Used?
(Check all that apply) |
Mechanical Clearing |
Please explain: | Skid steer or excavator to create the shore ramp and add rip rap. No trees or shrubs to be removed. Grass will be seeded around the ramp to prevent erosion. |
Excavation Details
Nature of Material to be used?
(Check all that apply) |
Sand Boulders |
Total Amount of Excavation and/or Fill proposed? (cubic yards) | 10 CuYd |
Total Area to be Graded and/or Filled? (L x W) | 168 ft2 |
Attach a photo of the area to be altered (as it exists today).: |
|
Erosion Control Practices
Indicate the following erosion control measures that will be used throughout and after your project? (Check all that apply) |
Seeding and/or Mulching Other (explain below) |
If other, please explain: | Rip rap for shore erosion and existing vegetation has been reseeded last year and will be continued to prevent land erosion from runoff. |
Describe how you intend to implement this plan and your finished vegetation plan.: |
We will continue to monitor and observe good erosion control practices. We had reseeded last year with guidance from a nursery specialist. |
Other Information
Other: | We respectfully request creation of a "ramp" (14' x 12') to allow ingress and egress of our dock and 2 boat lifts. The rip rap will be to control the shore erosion that has worsened from the past year. |
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.
I acknowledge that by submitting this application, the application and its attachments are public information.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #55511 (06/28/2022)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 06/28/2022 9:48 PM $200 Flat Fee |
$200.00 | x 1 | $200.00 |
Grand Total | |||
Total | $200.00 | ||
Payment 06/28/2022 | $200.00 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Peter C. Rhee - 06/28/2022 9:48 PM 8383a4ccaf12cf4ef2776a70075c30b4 bc4bd3abd0a797d973c68003bece2a3c | |
#1 Adminstrative Approval Group | Henry Egland - 06/29/2022 2:51 PM c5f0cbd9617c7fbdab33039ff29b96e1 98017c44d67400760041632bd6b7d316 |
Text: | Denied: No ramp allowed in SIZ, utilize vegetation and bioengineering to preserve shoreline. $100 refund issued 7/28/22 KB |
File(s): |
Text: | |
File(s): |
Date application was complete: | 06/28/2022 |
This review has been started by: | Henry Egland |
Zoning District of project location: | Shoreland |
Zoning Inspector: | Henry Egland |
Attach necessary inspection forms: |
|
Is the project in the Shore Impact Zone? | Yes |
Was an onsite conducted for this application? | Yes |
Is this an After-The-Fact application? | No |
Project located in the floodplain? | No |
Base Flood Elevation: |