Land Alteration Permit # 47070, App. # App-2022-009129, UID # 205688
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

If we have questions on the application who should we contact?
Name:
Janice M Bare
Phone:
(218820 - 4114
Email Address:
baresofaitkin@gmail.com
Mailing Address:
43478 State Hwy 210
Aitkin MN 56431
Are you the Property Owner? Yes

Project Location Search

Property:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
01-1-16450043478 STATE HWY 210
AITKIN, MN 56431
AITKIN TWPBARES ADDITIONS:28 T:47 R:27NEPOOR FARM LAKEBARE, JANICEBARE, JANICE
Driving directions to the property from Aitkin.:
2.5 miles west of Aitkin on Highway 210

Project Description

Please describe your proposed project:
boat landing inter-mixed with rock and vegetation to stabilize area for launching boat.
Will you be removing vegetation during this project? No

Site Drawing(s)

Land Alteration Site Sketch Checklist:
Location and size of all existing structures.
Location of all driveways and/or access roads.
Location of wetlands.
Location and size of alteration.
Attach a copy of your Site Sketch(s):

Excavation Details

Nature of Material to be used?
(Check all that apply)
Rock
Total Amount of Excavation and/or Fill proposed? (cubic yards) 1 CuYd
Total Area to be Graded and/or Filled? (L x W) 200 ft2
Attach a photo of the area to be altered (as it exists today).:

Erosion Control Practices

Indicate the following erosion control measures that
will be used throughout and after your project?
(Check all that apply)
Other (explain below)
If other, please explain:
rock intermixed with vegetation.  Erosion control to be implemented by contractor.
Describe how you intend to implement this plan
and your finished vegetation plan.:
Have a licensed contractor perform the work

Terms

General Terms Zoning Permits
  • All appropriate permit fees must be paid in full prior to any necessary review(s) of application.

  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

  • To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.

  • I acknowledge that by submitting this application, the application and its attachments are public information.

Land Use/Septic General Terms
  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

Invoice #55472 (06/29/2022)

Charge Cost Quantity Total
Non-Taxable
added 06/26/2022 3:27 PM

$200 Flat Fee

$200.00 x 1 $200.00
Grand Total
Total $200.00
Payment 07/01/2022$200.00
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantJanice M. Bare - 06/29/2022 12:43 PM
0f83b0ac72dc690477bc1238b85a7f21
c83e268294cc5a4f60deb1f080fadb62
 
#1 Adminstrative Approval GroupHenry Egland - 06/29/2022 12:49 PM
37f78fce28ff6e79a4c35dcec94ebd49
086af5524896f57216fe8a213f56e28a
 
#2 Inspector GroupHenry Egland - 07/01/2022 1:32 PM
70d3713b8f84f9e36e1a4df92dbb8e7f
5cbac1c53766381ca8e6b818f1da302a
 
#3 Final ActionSarah McMillan - 07/01/2022 1:52 PM
cccc4f1261eba67af80eb905573cf807
a64cb7bc5fe81ec8674eef95f7371466
 
Application has been approved. All signatures have been obtained.
Text:
Permit #47070
Approved for land alteration - Boat landing
File(s):
Text:
File(s):
    Date application was complete: 06/29/2022
    This review has been started by: Henry Egland
    Zoning District of project location: Shoreland
    Zoning Inspector: Henry Egland
    Attach necessary inspection forms:
      Is the project in the Shore Impact Zone? Yes
      Was an onsite conducted for this application? Yes
      Is this an After-The-Fact application? Yes
      Project located in the floodplain? No
      Base Flood Elevation:
      Powered by