If we have questions on the application who should we contact? |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Project Location Search
Property: |
|
Driving directions to the property from Aitkin.: | Highway 169 south East on county road 28 North on Twp 351 West on 498th Lane 40322 298th Lane |
Project Description
Please describe your proposed project: | Enhancement of a pre-existing path going from our driveway down to the lake. 6' W x 248' L, totaling 1,488 square feet. Seven Cu Yds of fill required to return the hill side of the path to its original slope. Rock at bottom of the path at the shoreline to be replaced with natural rock rip rap at a 3:1 slope. Natural rock rip rap will not average less than six inches or more than 30 inches in diameter. Straw and grass seed to be planted at shoreline to implement a three-foot vegetative buffer. Four shrubs will also be planted at the shoreline. Erosion control during the project: Rock on surface of path. The lake side of the path covered with straw and grass seed. The hillside will be sloped back to its original slope and straw and grass seed planted. A silt screen has been set up along the shoreline to prevent run-off during construction. Erosion control after the project: Ferns to be planted on both sides of the path. Natural vegetation and shrubs will cover three feet above the shoreline. Natural rip rap rock to be placed at shoreline at a 3:1 slope. There will be a natural vegetation buffer of three feet from the shoreline (un-mowed). |
Will you be removing vegetation during this project? | No |
Site Drawing(s)
Land Alteration Site Sketch Checklist: | Location and size of all existing structures. Location and size of all proposed structures. Location of all driveways and/or access roads. Location of wetlands. Location and size of alteration. Location of erosion control measures. Location of fill disposal, if done on site. Distance of alteration to OHWL (closest point) Distance of alteration to property lines. Distance of alteration to existing structures. Distance of alteration to proposed structures. Cross-section of cut and/or fill locations. |
Attach a copy of your Site Sketch(s): |
|
Excavation Details
Nature of Material to be used?
(Check all that apply) |
Gravel Rock |
Total Amount of Excavation and/or Fill proposed? (cubic yards) | 7 CuYd |
Total Area to be Graded and/or Filled? (L x W) | 1488 ft2 |
Attach a photo of the area to be altered (as it exists today).: |
|
Erosion Control Practices
Indicate the following erosion control measures that will be used throughout and after your project? (Check all that apply) |
Silt Fence Seeding and/or Mulching Other (explain below) |
If other, please explain: | Straw, bushes, ferns |
Describe how you intend to implement this plan and your finished vegetation plan.: |
Gravel to be placed on path to prevent erosion, as well as straw and vegetation to be planted on both sides of path. Natural vegetation and shrubs to be grown/planted for three feet behind shoreline rock. |
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.
I acknowledge that by submitting this application, the application and its attachments are public information.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #55461 (07/21/2022)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 06/24/2022 12:00 PM $200 Flat Fee |
$200.00 | x 1 | $200.00 |
Grand Total | |||
Total | $200.00 | ||
Payment 07/21/2022 | $200.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Tracy L. Durand - 08/30/2022 6:43 PM c26bed8651dea19568153fe8f632f7a6 b4e8a9b2c7d36cbc5999b1fdd164e8f1 |
#1 Adminstrative Approval Group | Henry Egland - 08/31/2022 8:42 AM 60bc80c06e8f19922021c7ad5fca8cd2 bc5370b9f486dd16a13332e8ec500260 |
#2 Inspector Group | Henry Egland - 08/31/2022 8:53 AM 6a37f7b310919de4b3310f896957a745 0d374ad768568bc5d7a86c4da4ad1f3f |
#3 Final Action | Kim Burton - 08/31/2022 4:08 PM eac4adc086d9d2ab27e22306a555b55b f185c6eda8de4b4309f9b97a933bb8e2 |
Public Notes
Text: | Permit # 47266. Approved for land alteration. Restoration work to be completed by October 31st, 2022 |
File(s): |
|