Land Use Application App. # App-2022-008974, UID # 205488
App. Status: Denied
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

Enter Applicant Contact Information:
Name:
Nathan Johnson
Phone:
(612749 - 0657
Email Address:
01nathanjohnson@gmail.com
Mailing Address:
20970 Gypsy valley RD NW
Nowthen MN 55303
Are you the Property Owner? Yes

Property Location

Property Location:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
39-0-04030248295 235TH PL
MCGREGOR MN 55760
WORKMAN TWPS:23 T:49 R:24RDRAT LAKEJOHNSON, NATHAN & CHRISTINEJOHNSON, NATHAN & CHRISTINE
Enter directions to the property (if no property address assigned):
Head North on Us 169 15 miles turn right on 480th Street continue 13 miles turn left on 235th Place continue to end of driveway 
Septic and house structure is marked out near gravel pad.

Project Checklist

1.) Is the property zoned Shoreland? Yes
3.) Are there any wetlands or lowlands on/near the project site? No
4.) Will the structure(s) be used for commercial purposes? No
5.) Is there an existing septic system on the property?
(Outhouse/Privies are also considered septic systems)
No
6.) Are you applying to install a new septic system? Yes

Septic Type

Select the type of septic you are applying for:
Residential Mound (Type 1)

Design Information

Attach Septic Design & Management Plan:
Septic Designer:
None

Operating Permit

Attach the Operating Permit Application & Operating Permit Maintenance Contract:

Installer

Self Install or Licensed Install: Licensed Septic Installer
Licensed Installer Name:
None
Installer License # : 211

Project Description

Please describe your proposed project:
I am proposing to build a 32 x 39 foot one level cabin with one bedroom and a flex room,
with a kitchen and living room and bathroom with laundry.
What is the height of your structure? 16 Feet

Project Type

Item 1 - Structure Type: New Residence incl. attached decks/porches/garages
Item 1 - Size: 1115 ft2

Shoreland Data

Setback distance from Ordinary High Water Level to the proposed construction? (closest point) 150 Feet
Will the proposed structure(s) be less than 35 foot maximum height? Yes
Are you constructing a walkout basement? No
If you are building an accessory structure, will there will be a loft or second story? No

Natural Landscape Protection Plan

Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? No
How many cubic yards of fill or excavation will be done on the property? 20 CuYd
How close to the property line will any fill be placed or any excavation be done? 10 Feet
What percent slope of the land currently exists on the project site? 42 % slope
Select the erosion control methods that will be used throughout and after your project:
(Check all that apply)
6.) What will be done after construction to control
erosion?
reseeding around structure.

Site Plan

Attach Site Plan:
Is the site staked and ready for inspection? Yes

Additional Info

Additional info:
(optional)
After investigating when lot was created it was determined to be April of 1991.  please refer to Molly R. on planning and zoning.  Land was surveyed and evaluated to be a slope not a bluff.

Terms

Land Use/Septic Terms & Conditions
  • All appropriate permit fees must be paid in full prior to any necessary review(s) of application.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.

  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • Permit fees are non-refundable after a permit has been approved.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."

  • Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

  • I acknowledge that by submitting this application, the application and its attachments are public information.

Invoice #55278 (06/05/2022)

Charge Cost Quantity Total
Non-Taxable
added 06/05/2022 9:38 PM

$400 Flat Fee

$400.00 x 1 $400.00
added 06/05/2022 9:38 PM

$350 Flat Fee

$350.00 x 1 $350.00
Grand Total
Total $750.00
Payment 06/05/2022$750.00
Due$0.00

Approvals

ApprovalSignature
ApplicantNathan K. Johnson - 06/07/2022 1:30 PM
ae48772e869b68c16ce92bf3399ba2e8
4e3a9f039ff4e17b339ebf8708e88512
#1 Adminstrative Approval GroupMolly Oestreich - 06/08/2022 10:25 AM
bd7502aefee6e42b3025427562fa90e2
be69ffb93d0c2cd3ceed82d44a211e4d
Application has been approved. All signatures have been obtained.

Public Notes

Text:
Denied.  "Per 7082.0100(F.) A provision that requires that all lots created after January 23, 1996, have a minimum of two soil treatment and dispersal areas that support systems as described in parts 7080.2200 to 7080.2230 or site conditions described in part 7081.0270, subparts 3 to 7, as applicable." MN state rule. 
Also, Per Section 5.13 in Aitkin County SSTS Ordinance 

Lot split from 1997.

Transferred payment to app 2022-009390 KB
File(s):

    Admin Checklist

    Date application was complete:
    Review started by:
    Zoning District of project location:
    Required OWHL setback distance:
    "Other" OHWL setback distance is:
    Project located in the floodplain?
    Base Flood Elevation:
    Lowest Floor Elevation:
    Is an after construction elevation certificate required?
    Property line setbacks appear to be met?
    Road R-O-W setbacks appear to be met?
    Bluff setbacks appear to be met?
    Septic Tank setback appears to be met with/without an engineer's report?
    Septic Drainfield setback appears to be met with/without an engineer's report?
    Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified?
    Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot?
    Is this After-The-Fact?

    Inspector Checklist

    Zoning Inspector:
    Attach necessary inspection forms/photos:
      Notes:
      Was an onsite conducted for this application?
      Powered by